flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Sacred Heart University to build $60 million hockey arena

Arenas

Sacred Heart University to build $60 million hockey arena

JLG and S/L/A/M Collaborative are designing the project.


By David Malone, Associate Editor | January 27, 2020
SHU hockey rink

Renderings courtesy Sacred Heart University

A new 4,000-seat, $60 million hockey and skating arena is set to begin construction this summer on the Sacred Heart University West Campus in Fairfield, Conn.

The arena will be home to the Division I men’s and women’s hockey programs, the university’s nationally ranked figure skating team, and the men’s club ice hockey team. The arena will also feature amenities such as a pro shop, beer gardens, food venues, suites, meeting rooms, broadcast facilities, and offices. Locker rooms and training rooms will also be included for the student athletes. 

 

SHU hockey arena aerial

 

Special events such as guest lectures, concerts, convocations, and other activities open to students and the community will be hosted in the building. Time will also be set aside for students, faculty, staff, and community members to skate. Students studying in the areas of sports communication & media, sport management, and hospitality will be able to use the arena as a classroom and practice space.

 

See Also: 105,000-sf vertical mass timber expansion will cap D.C.’s 80 M Street

 

The project is slated for completion in 2022.

 

SHU arena concourse

Tags

Related Stories

| May 16, 2012

AEG releases 3D video of L.A.'s Farmers Field

The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.

| Feb 2, 2012

Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012

Winning projects will be featured in the May issue of BD+C. 

| Jan 24, 2012

U of M installs new lighting at Crisler Player Development Center

Energy efficient lighting installed at PDC reduce costs and improves player performance.

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Nov 22, 2011

Report finds that L.A. lags on solar energy, offers policy solutions

Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.

| Nov 9, 2011

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Program leads the industry in recovering and recycling roofing membrane into new roofing products.

| Nov 1, 2011

Sasaki expands national sports design studio

Sasaki has also added Stephen Sefton to the sports design studio as senior associate. 

| Oct 20, 2011

UNT receives nation’s first LEED Platinum designation for collegiate stadium

Apogee Stadium will achieve another first in December with the completion of three wind turbines that will feed the electrical grid that powers the stadium.

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 16, 2011

Largest solar installation completed at Redskins' football stadium

On game days, solar power can provide up to 20% of FedExField’s power.

boombox1 - default
boombox2 -
native1 -

More In Category




Giants 400

Top 70 Sports Facility Construction Firms for 2023

AECOM, Turner Construction, Clark Group, Mortenson head BD+C's ranking of the nation's largest sports facility contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021