flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Roofing contractors recognized for workmanship

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.


By By BD+C Staff | February 28, 2012

Winners of the 2011 Contractor Project of the Year Competition were announced by Sika Sarnafil. Winners were judged on project complexity, design uniqueness, craftsmanship, and creative problem solving.

Winners include:

  • TD Garden in Boston, Mass;
  • Grand Harbor Condominium in Destin, Fla;
  • New office complex in Warminster, Pa.; and
  • Griffin Hall, Northern Kentucky University in Highland Heights, Ky.

A winner and two finalists in four different categories: Low Slope, Steep Slope, Waterproofing and Sustainability were recognized for outstanding workmanship in completing a project using a Sika Sarnafil thermoplastic membrane for roofing or waterproofing applications.

Low Slope Category Winners
Greenwood Industries, Inc. of Millbury, Mass. won first place in the Low Slope category for the re-roofing of the TD Garden, home to the Boston Bruins and Boston Celtics. The 19,600-seat arena has a distinctive barrel roof now covered with an energy-efficient Sika Sarnafil EnergySmart Roof System. During the project Greenwood worked around a continuous schedule of TD Garden events and even withstood a hurricane to complete the project. The second place winner was All Weather Waterproofing, Inc., Salt Lake City, Utah, for the Wilkinson Student Center at Brigham Young University, Provo, Utah. Third place went to Letner Roofing Company, Inc., Orange, Calif., for the Pacific Design Center “Red” Building in West Hollywood, Calif.

Steep Slope Category Winners
In the Steep Slope category, Bel-Mac Roofing, Inc., of Santa Rosa Beach, Fla., was awarded first place for their work on Grand Harbor Condominium in Destin, Fla. High winds, numerous roof levels, and a complex geometric roof design pushed the Bel-Mac crew. The company’s creative problem solving enabled them to install a watertight Sika Sarnafil Décor Roof System that preserves the upscale look established by the condo’s failed standing seam metal roof. Peach State Roofing, Inc., Lawrenceville, Ga., was the second place finisher for the Catholic Center at the University of Georgia, Athens, GA, and Diamond Roofing Company, Inc., Syracuse, N.Y., was the third place finalist for the Finger Lakes Residential Center in Lansing, N.Y.

Waterproofing Category Winners
Tecta America Zero Company, LLC, based in Cincinnati, Ohio, took first place in the Waterproofing class for Griffin Hall, Northern Kentucky University in Highland Heights, Ky. The company battled weather conditions and an aggressive schedule for this newly constructed facility, which involved three distinct roof areas and included a vegetated green roof protected by Sika Sarnafil’s G476 waterproofing membrane. Second place in this category went to A-1 Roofing Company, Elk Grove Village, Ill., for the United Cargo Facility in Chicago, and third place to CitiRoof Corporation in Columbia, Md., for the H.D. Woodson High School in Washington, D.C.

Sustainability Category Winners
In the Sustainability category, Delta Contracting Services, Inc., of East Brunswick, N.J., was awarded first place for a new office complex in Warminster, Pa. This facility received a very high worldwide LEED score for newly constructed office buildings and garnered a LEED Platinum Certification. In second place was Morris Roofing & Sheet Metal Corporation, Springfield, Mass., for the Mass Mutual headquarters in Springfield, Mass., and in third place for this grouping was Progressive Roofing, LLC, of Phoenix, Ariz. for the Wells Fargo Arena at Arizona State University in Tempe, Ariz. BD+C

Related Stories

| Aug 11, 2010

Carpenters' union helping build its own headquarters

The New England Regional Council of Carpenters headquarters in Dorchester, Mass., is taking shape within a 1940s industrial building. The Building Team of ADD Inc., RDK Engineers, Suffolk Construction, and the carpenters' Joint Apprenticeship Training Committee, is giving the old facility a modern makeover by converting the existing two-story structure into a three-story, 75,000-sf, LEED-certif...

| Aug 11, 2010

Utah research facility reflects Native American architecture

A $130 million research facility is being built at University of Utah's Salt Lake City campus. The James L. Sorenson Molecular Biotechnology Building—a USTAR Innovation Center—is being designed by the Atlanta office of Lord Aeck & Sargent, in association with Salt-Lake City-based Architectural Nexus.

| Aug 11, 2010

San Bernardino health center doubles in size

Temecula, Calif.-based EDGE was awarded the contract for California State University San Bernardino's health center renovation and expansion. The two-phase, $4 million project was designed by RSK Associates, San Francisco, and includes an 11,000-sf, tilt-up concrete expansion—which doubles the size of the facility—and site and infrastructure work.

| Aug 11, 2010

Goettsch Partners wins design competition for Soochow Securities HQ in China

Chicago-based Goettsch Partners has been selected to design the Soochow Securities Headquarters, the new office and stock exchange building for Soochow Securities Co. Ltd. The 21-story, 441,300-sf project includes 344,400 sf of office space, an 86,100-sf stock exchange, classrooms, and underground parking.

| Aug 11, 2010

New hospital expands Idaho healthcare options

Ascension Group Architects, Arlington, Texas, is designing a $150 million replacement hospital for Portneuf Medical Center in Pocatello, Idaho. An existing facility will be renovated as part of the project. The new six-story, 320-000-sf complex will house 187 beds, along with an intensive care unit, a cardiovascular care unit, pediatrics, psychiatry, surgical suites, rehabilitation clinic, and ...

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

| Aug 11, 2010

Wisconsin becomes the first state to require BIM on public projects

As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...

| Aug 11, 2010

Opening night close for Kent State performing arts center

The curtain opens on the Tuscarawas Performing Arts Center at Kent State University in early 2010, giving the New Philadelphia, Ohio, school a 1,100-seat multipurpose theater. The team of Legat & Kingscott of Columbus, Ohio, and Schorr Architects of Dublin, Ohio, designed the 50,000-sf facility with a curving metal and glass façade to create a sense of movement and activity.

boombox1
boombox2
native1

More In Category

Multifamily Housing

AEC inspections are the key to financially viable office to residential adaptive reuse projects

About a year ago our industry was abuzz with an idea that seemed like a one-shot miracle cure for both the shockingly high rate of office vacancies and the worsening housing shortage. The seemingly simple idea of converting empty office buildings to multifamily residential seemed like an easy and elegant solution. However, in the intervening months we’ve seen only a handful of these conversions, despite near universal enthusiasm for the concept. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021