flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

PVs play new roles as a teaching tool

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.


By By Susan Bady, Contributing Editor | September 12, 2011
Solar thermal collectors, oriented vertically on the wall, heat water for the Walking Mountains Science Center in Avon, Colo.
This article first appeared in the September 2011 issue of BD+C.

Federal and state incentives have sparked renewed interest in solar photovoltaic systems as a way for K-12 schools to lower their utility bills and, at the same time, educate students about the benefits of solar and other alternative energy sources.

Solar PV providers in California, Colorado, Massachusetts, New Jersey, and Utah are partnering with school districts to install solar equipment and develop a teaching curriculum. Funding can come from a variety of government and private sources, with the bulk coming from the American Reinvestment and Recovery Act of 2009.

Some organizations are sponsoring their own solar-school initiatives in conjunction with the National Energy Education Development Project (NEED). The Walmart Foundation is partnering with NEED and the Foundation for Environmental Education to implement solar schools in five cities: Chicago, Los Angeles, Minneapolis, Seattle, and Washington, D.C.

UTAH PUTS THE SUN TO WORK

Utah’s Solar for Schools program was launched in 2010, after the state received ARRA funding to install and promote renewable energy. The Salt Lake City office of Johnson Controls, Inc. won a $3 million bid to install solar in 73 Utah schools. Thus far, 55 installations had been completed.

Oscar Rangel, JCI’s manager of public-sector solutions, based in Denver, says the company’s system will save $7.75 per watt, for a potential annual savings of $800-1,200. Rangel stresses that there’s more to the program than putting panels on the roof: “There’s also an educational component that involves the teachers, the kids, and the administration.” 

In an intensive one-day workshop developed by Johnson Controls and the National Energy Foundation, teachers from around the Beehive State were exposed to curriculum materials that are correlated to state and national standards. NEF educators provide on-site teacher training geared to children from elementary school through high school.

“The labs are very hands-on, with activities that engage the students in learning not just about solar, but all different kinds of alternative energy,” says one participant, Laura Wheeler, who teaches middle school and high school in Morgan, Utah.

In one lab, students learn how to configure solar panels to generate the most power. (Another lab challenges them to see who can build the best wind generator.) There’s also a program where students patrol the building to monitor and report on energy usage. Johnson Controls is supplying software that links all the solar schools in Utah, allowing students to compare their school’s performance with that of others.

A typical installation consists of a 5.3-kW solar PV module, which can provide enough electricity to power the computer lab and a few classrooms or a library, Rangel says. That may not sound like much, but don’t tell that to teacher Laura Wheeler. “Even if we’re just lighting a library with solar, that’s a big deal to our school,” she says. “We’re in a very small, rural school district, so every penny we save goes a long way.”

CALIFORNIA RAMPS UP SOLAR IN SCHOOLS

With the California Solar Initiative, a statewide solar rebate program, California’s public sector is forecasted to save $2.5 billion from solar installations over the 30-year life of the systems. Educational institutions are expected to save approximately $1.5 billion of the total, according to SunPower Corp., a solar provider based in San Jose, Calif. The California School Boards Association recently announced Solar Schools, a program that supports school districts in developing efficient solar projects. Districts borrow ARRA funds and the federal government subsidizes the interest rate, meaning that loans are repaid at an average rate of 1.5%.

Interest in solar for schools has been accelerating due to a growing emphasis on energy conservation. “Currently, we have installations planned or under way in more than 90 schools,” says Bill Kelly, SunPower’s managing director. “It’s keeping us busy along with local electricians, steel fabricators, and erectors, so we’re also stimulating the local economy.”

The SunPower systems range from 100 kW to 1,000 kW. “The larger systems are for high schools,” Kelly says. “On average, in the schools we’re working with, 75-80% of the electric bill is offset or reduced by solar.”

Most solar panels are designed for parking lots rather than rooftops, he says. The panels form a canopy over the cars, with the secondary benefit of providing shade during hot weather.

As in Utah, California’s school districts want to not only invest in solar but also bring information about the technology into the classroom.

“Many of the school districts have engineering academies, and we’re working with them to develop a renewable energy curriculum,” says Kelly.

Recently, 16 high school students from the San Ramon Valley Unified School District completed a two-week course sponsored by SunPower.

“They learned everything about solar that you could cram into two weeks,” says SunPower’s Madeleine Maguire. “The idea is to create solar ambassadors so that they can teach their peers about this technology.”  

CHECKING SOLAR’S AFFORDABILITY

With solar, first cost is still the issue for property owners and their Building Teams. The price of PV panels has fallen in the last two years due to greater efficiencies in manufacturing and technology, as well as increased competition among a growing number of suppliers.

According to the market intelligence firm IHS iSuppli, in 2009 the cost per watt for a PV solar panel was nearly $2.50. By 2015, that cost is expected to drop to as low as $1, or roughly $200 per panel. Installation prices, too, are expected to decrease about 10% a year—from $5 per watt to around $3 per watt by 2015, according to IHS. The worldwide PV market is poised to double by 2015, with the U.S. market growing steadily.

SunPower’s Kelly agrees that first cost is a constraint: “Even though solar has great economics for the long term, building owners need to watch their budgets.” Still, he urges Building Teams not to miss out on rebates by waiting for prices to go down. “In California, at least, the sooner you install it the bigger the incentive you get,” he says. 

SIDEBAR: Science School Raises the Green Bar

The Walking Mountains Science Center in Avon, Colo., is on target to be certified LEED Platinum, but that wasn’t the Building Team’s primary goal. “We didn’t want to just talk the talk,” says Barry Monroe, LEED AP, project manager for local builder R.A. Nelson and Associates. “We wanted to do everything we could to make the building as green and as energy efficient as possible.” The facility will act as an experiential learning center for adults and children, as well as a model of sustainability.

Designed by Avon-based architects Zehren & Associates, the building produces 42% of its own electricity on site. PV solar panels on two south-facing roofs create energy, and a heat capture system harvests excess heat from the electrical equipment room and transfers it to domestic hot water. The sun also generates heat for the radiant in-floor system.

“Sun shades are part of the solar component and work in conjunction with daylighting to reduce heat gain inside the building,” Monroe says. The building is not air conditioned.

Students will monitor the building’s energy and water usage via a computerized dashboard. The solar system is expected to save about $6,000 a year in energy costs. 

Related Stories

| Aug 11, 2010

Colonnade fixes setback problem in Brooklyn condo project

The New York firm Scarano Architects was brought in by the developers of Olive Park condominiums in the Williamsburg section of Brooklyn to bring the facility up to code after frame out was completed. The architects designed colonnades along the building's perimeter to create the 15-foot setback required by the New York City Planning Commission.

| Aug 11, 2010

Wisconsin becomes the first state to require BIM on public projects

As of July 1, the Wisconsin Division of State Facilities will require all state projects with a total budget of $5 million or more and all new construction with a budget of $2.5 million or more to have their designs begin with a Building Information Model. The new guidelines and standards require A/E services in a design-bid-build project delivery format to use BIM and 3D software from initial ...

| Aug 11, 2010

Opening night close for Kent State performing arts center

The curtain opens on the Tuscarawas Performing Arts Center at Kent State University in early 2010, giving the New Philadelphia, Ohio, school a 1,100-seat multipurpose theater. The team of Legat & Kingscott of Columbus, Ohio, and Schorr Architects of Dublin, Ohio, designed the 50,000-sf facility with a curving metal and glass façade to create a sense of movement and activity.

| Aug 11, 2010

Residence hall designed specifically for freshman

Hardin Construction Company's Austin, Texas, office is serving as GC for the $50 million freshman housing complex at the University of Houston. Designed by HADP Architecture, Austin, the seven-story, 300,000-sf facility will be located on the university's central campus and have 1,172 beds, residential advisor offices, a social lounge, a computer lab, multipurpose rooms, a fitness center, and a...

| Aug 11, 2010

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

| Aug 11, 2010

Luxury Hotel required faceted design

Goettsch Partners, Chicago, designed a new five-star, 214-room hotel for the King Abdullah Financial District (KAFD) in Riyadh, Saudi Arabia. The design-build project, with Saudi Oger Ltd. as contractor and Rayadah Investment Co. as developer, has a three-story podium supporting a 17-story glass tower with a nine-story opening that allows light to penetrate the mass of the building.

| Aug 11, 2010

Three Schools checking into L.A.'s Ambassador Hotel site

Pasadena-based Gonzalez Goodale Architects is designing three new schools for Los Angeles Unified School District's Central Wilshire District. The $400 million campus, located on the site of the former Ambassador Hotel, will house a K-5 elementary school, a middle school, a high school, a shared recreation facility (including soccer field, 25-meter swimming pool, two gymnasiums), and a new publ...

| Aug 11, 2010

New Jersey's high-tech landscaping facility

Designed to enhance the use of science and technology in Bergen County Special Services' landscaping programs, the new single-story facility at the technical school's Paramus campus will have 7,950 sf of classroom space, a 1,000-sf greenhouse (able to replicate different environments, such as rainforest, desert, forest, and tundra), and 5,000 sf of outside landscaping and gardening space.

boombox1 - default
boombox2 -
native1 -

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 


MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021