flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Yankee Stadium gets outfield assist from BIM

Yankee Stadium gets outfield assist from BIM


August 11, 2010
This article first appeared in the 200907 issue of BD+C.



Turner Construction utilized Autodesk Navisworks Manage software as an element in the building information modeling process used to complete the $1.5 billion Yankee Stadium. Turner used the latest BIM processes and Autodesk Revit-based products and Navisworks Manage software to help streamline workflow and collaboration among subcontractors. Digital data from multiple design software sources were combined in a single virtual Navisworks Manage model of the stadium that enabled the Building Team to identify systems, spatial clashes, and conflicts before construction.

Autodesk

Input No. 202 at BDCnetwork.com/quickResponse

boombox1 - default
boombox2 -
native1 -
halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â