flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Oregon is first state to change building code to allow tall mass timber buildings

Codes and Standards

Oregon is first state to change building code to allow tall mass timber buildings

Statewide alternate method allows early technical consideration and approval.


By Peter Fabris, Contributing Editor | August 22, 2018

Oregon recently became the first state to approve the use of science-based building code requirements for tall mass timber buildings.

Under Oregon’s statewide alternate method (SAM), developers can receive early technical consideration and approval on tall mass timber structures. The Administrator of the State Building Codes Division issued SAM No. 18-01, which provides a prescriptive path for utilization of the code requirements developed by the International Code Council (ICC) Tall Wood Building Ad Hoc Committee over the past two years.

The requirements also received a favorable recommendation during the April 2018 ICC Code Action Hearings—the first step of the process to include them in the 2021 International Codes.

“Mass timber is a new category of wood products that will revolutionize how America builds, and we’ve seen interest in it continue to grow over the last several years,” said American Wood Council President & CEO Robert Glowinski in a news release. “This action by the Codes Division Administrator helps code officials in Oregon by making provisions consistent throughout the state.”

Related Stories

| Aug 16, 2012

Canada’s first net-positive building under construction in Milton, Ontario

The GreenLife Business Centre in Milton, Ontario near Toronto is set to become the first net-positive energy building in Canada.

| Aug 9, 2012

St. Paul cannot adopt overly restrictive egress windows policy, court rules

The Minnesota state Court of Appeals rejected St. Paul's attempt to adopt a policy on egress windows that was stricter than state law.

| Aug 9, 2012

Fire chief questions building code after St. Louis apartment building fire

A blaze that destroyed a 197-unit apartment building in St. Louis, Mo., displacing 250 residents, led the city’s fire chief to question the materials used in the construction of the four-story building.

| Aug 9, 2012

Ramps have strict criteria for ADA compliance

It is important for businesses to understand that an existing ramp at a building entrance may not mean that barrier removal obligations under the Americans with Disabilities Act have been met.

| Aug 9, 2012

ClickSafety, AGC provide online training program for construction professionals

Construction professionals will be able to take a wide range of mandatory and optional safety training programs online through a new collaboration between the Associated General Contractors of America and ClickSafety.

| Aug 9, 2012

Tornado-ravaged Greensburg, Kansas’s new green buildings save $200K a year

The town of Greensburg, Kan., virtually destroyed by a tornado in 2007, decided to rebuild 13 public buildings according to green standards.

| Aug 2, 2012

FBI investigates Turner, Tishman, Skanska, and Plaza Construction for billing practices on public projects in New York

After charges filed against Bovis Lend Lease in April led to an admission of guilt and $56 million in fines for overbilling clients, federal prosecutors are investigating the billing practices of four more New York City construction firms, according to reports.

| Aug 2, 2012

Court ruling may lead to more destructive testing on unfinished Harmon Tower in Las Vegas

A Clark County, Nevada district court judge ruled that the unfinished Harmon Hotel at CityCenter, operated and half-owned by MGM Resorts, could not use extrapolation when requesting damages at a possible trial.

| Aug 2, 2012

NIBS council recommends private and public measures to improve building sustainability

A new report by the National Institute of Building Sciences Consultative Council highlights four several areas that need focus to improve sustainability in buildings and infrastructure.

| Aug 2, 2012

Greenbuild summit will focus on greening affordable housing

A two-day summit focused on green building in the affordable housing market will be held Nov. 13 - 14, 2012 in San Francisco, Calif. at the Greenbuild International Conference & Expo.

boombox1 - default
boombox2 -
native1 -

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 


MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021