flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Online travel company moves to the 66th floor of the Empire State Building

Office Buildings

Online travel company moves to the 66th floor of the Empire State Building

The new headquarters includes almost 20,000 sf of additional space.


By David Malone, Associate Editor | June 11, 2018
Agoda headquarters in Empire State Building
Agoda headquarters in Empire State Building

To paraphrase Denzel Washington, King Kong doesn’t have anything on Agoda. Taking a page out of the giant monster’s book, Agoda, an online travel company, is climbing the Empire State Building. Formerly occupying 7,600 sf on the iconic building’s 47th floor, the company has moved to a 27,000 sf space on the 66th floor.

The tech-based company wanted a headquarters space with an open floor plan that is more conducive to collaboration and a better workflow. The space features an industrial aesthetic with an exposed ceiling, modern concrete flooring, exposed steel columns, and 360-degree views.

The deal for the new space is for 10 years. The build team consisted of Vocon Architecture, MG Engineering, and James E. Fitzgerald, Inc.

 

See Also: Yeti’s new global headquarters evokes the outdoors

 

Agoda headquarters in the Empire State Building

boombox1 - default
boombox2 -
native1 -

More In Category


AEC Innovators

3 ways the most innovative companies work differently

Gensler’s pre-pandemic workplace research reinforced that great workplace design drives creativity and innovation. Using six performance indicators, we're able to view workers’ perceptions of the quality of innovation, creativity, and leadership in an employee’s organization.


Laboratories

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021

Â