flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Office developers aim for zero carbon without offsets

Codes and Standards

Office developers aim for zero carbon without offsets

Some companies searching for office space make net zero carbon a requirement.


By Peter Fabris, Contributing Editor | July 22, 2022
Office Development
Courtesy Pixabay.

As companies reassess their office needs in the wake of the pandemic, a new arms race to deliver net zero carbon space without the need for offsets is taking place in London, according to a recent Bloomberg report.

Dutch developer Edge, for example, recently committed to reach absolute zero carbon on its new developments by at least 2050. Its future projects will eventually be built and operated in a way that requires no tree planting to mitigate their impact. Australia’s Lendlease Corp. and Copenhagen-based Nordic Real Estate Partners A/S have made similar pledges.

If the firms achieve that goal, they will outpace net-zero developments being promoted by many of Europe’s largest landlords that require offsets to reach zero-carbon goals. Edge will continue to build projects that include offsets for now as it seeks to build more sustainable buildings that won’t need any offsets to reach net-zero.

Edge plans to immediately reduce embodied emissions for any new projects by at least 50%. That would mean a maximum upfront embodied carbon target of 500 kilograms of CO2 for each square meter.

Related Stories

| Jan 26, 2012

Industry challenges Connecticut's suit over defective construction work

The dispute arose over multimillion-dollar leaks at the University of Connecticut's law library.

| Jan 26, 2012

Earthquake 'fuse' could save buildings during temblors

The idea is to use an earthquake "fuse" that can prevent the tiny fractures and warps that make structures unsafe after a quake and very expensive to repair.

| Jan 26, 2012

HPD open materials standard for green building materials gains momentum

GreenWizard, provider of a cloud-based product management and project collaboration software, is the latest industry participant to sign on

| Jan 26, 2012

Siemens launches smoke detection knowledge center

New knowledge center web site demonstrates efficacy of smoke detection. 

| Jan 18, 2012

Chile's seismic code upgrades credited with saving lives in 2010 quake

Since 1960, when Chile suffered a 9.5 magnitude quake, the largest ever recorded; the country has steadily improved building codes to protect lives and property.

| Jan 18, 2012

Report analyzes residential hurricane codes in 18 states

The Insurance Institute for Business & Home Safety (IBHS) released a new report analyzing residential building codes in 18 hurricane-prone coastal states along the Gulf of Mexico and the Atlantic Coast.

| Jan 18, 2012

Death in Chicago high-rise apartment fire blamed on fire code

The death of a Chicago woman who stepped off her elevator into a blazing inferno last week has underscored the need for fire sensors in elevators.

| Jan 18, 2012

California approves open cell spray foam for energy efficiency standards

The California Energy Commission (CEC) now recognizes open-cell spray foam as an accepted insulation in its 2008 Building Energy Efficiency Standards.

| Jan 5, 2012

Building to LEED standards now an 'easy call' from cost standpoint

Once seen as a cost burden, building to LEED standards is now an "easy call," according to Dan Probst, chairman of energy and sustainability for real estate management and development firm Jones Lang LaSalle.

| Jan 5, 2012

Minnesota's GreenStep Cities program aids communities in winning grants

GreenStep Cities, a Minnesota initiative, was designed to provide greater recognition to the state's communities for achievements in meeting sustainability standards and goals.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021