flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Mercedes-Benz Stadium in Atlanta will be the NFL’s first LEED Platinum stadium

Sports and Recreational Facilities

Mercedes-Benz Stadium in Atlanta will be the NFL’s first LEED Platinum stadium

The Atlanta Falcons new home is expected to save 40% in energy usage than a typical NFL stadium.


By David Malone, Associate Editor | September 26, 2016

Rendering courtesy of HOK

New sports stadiums and arenas are quickly becoming beacons of new technology, modern design, and sustainability. Take Mercedes-Benz stadium, for example. The future home of the Atlanta Falcons has an arresting design, an ultra-modern appearance, and is looking to become the NFL’s first LEED Platinum v4 stadium and one of the first LEED Platinum professional sports stadiums in the country, regardless of sport.

According to inhabitat.com, water conservation and management is a core focus of the stadium’s design. The facility will capture rainwater for reuse in the cooling tower and in irrigation of the landscape and trees, will feature waterless urinals, and will slowly release captured stormwater runoff. Mercedes-Benz Stadium will be 42% more water efficient than the Georgia Dome, the Falcons old facility.

To reduce energy usage, the stadium will use solar panels, LED lighting, energy monitoring equipment, and energy-efficient glazing that allows plenty of natural light into the structure, reducing artificial lighting requirements. Additionally, the stadium has a retractable roof for more natural light and ventilation. Mercedes-Benz Stadium will save more than 40% in energy usage compared to typical stadium designs

The facility, which has been designed by HOK, is expected to be completed by summer 2017 and ready in time for the Falcons 2017 season home opener.

 

 

Rendering courtesy of HOK

 

Rendering courtesy of HOK

 

Rendering courtesy of HOK

Related Stories

Giants 400 | Oct 22, 2021

2021 Sports Facilities Giants: Top architecture, engineering, and construction firms in the U.S. sports and recreation facility sector

AECOM, Populous, Kimley-Horn, and HOK top BD+C's rankings of the nation's largest sports and recreation facility sector architecture, engineering, and construction firms, as reported in the 2021 Giants 400 Report.

Arenas | Sep 20, 2021

LA Clippers unveil $1.8 billion Intuit Dome

AECOM is the lead designer for the project.

Sports and Recreational Facilities | Sep 15, 2021

Aston Martin breaks ground on new F1 headquarters

The project is located in Northamptonshire.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Sports and Recreational Facilities | Aug 25, 2021

The rise of entertainment districts and the inside-out stadium

Fiserv Forum, home to the 2021 NBA Champion Milwaukee Bucks, proved that the design of the space outside a stadium is just as important as inside.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Sports and Recreational Facilities | Aug 18, 2021

Populous’ design takes center stage for MLB’s Field of Dreams game

The movie-inspired ballpark is located in Dyersville, Iowa.

Sports and Recreational Facilities | Aug 5, 2021

Austin FC’s Q2 Stadium completes

Gensler designed the project.

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021