The kehoe iron works occupies a 6.3-acre site on the Savannah River, in the Savannah National Historic Landmark District. Built in 1873 and 1902 and closed in 1930, it was acquired by the Savannah Gas Company in the 1940s; it later sat unused for 28 years.
Twelve years ago, Georgia newspaper magnate and philanthropist Charles H. Morris purchased the site with the goal of turning it into a community asset.
In 2013, Morris’s Randolph Street Development firm brought in Lominack Kolman Smith Architects to lead the reconstruction. The five-year effort married three modern additions to Kehoe’s four historic buildings.
Three different shoring systems were used to restore the brick on the historic buildings. Toxic heavy metals from gas tanks on the site had to be remediated.
Entire sections of the machine shop’s corrugated metal cladding were missing; several rusted columns were dangling from trusses. Some historic columns were saved by splicing them with new base materials.
Photo: Richard Leo Johnson/Atlantic Archives.
To address the settling at one corner of one of the historic buildings, the structural and geotechnical engineers designed a system of concrete grade beams placed below the brick foundation wall; these were supported by helical piers to “carry” the brick wall.
A specialty metalworks fabricator recreated a historic walk baluster—part of the complex’s unusual Second Empire tower—based on an 1898 photo.
The new performing arts and events venue has a catering kitchen, a soundproof green room, conference spaces, and a teaching kitchen.
Since opening earlier this year, Kehoe Iron Works has hosted the Savannah Music Festival, Chamber of Commerce events, the Best of Savannah party, and an “American Idol” audition.
Photo: Richard Leo Johnson/Atlantic Archives.
Gold Award Winner
BUILDING TEAM Lominack Kolman Smith Architects (submitting firm, architect) Randolph Street Development (owner) Saussy Engineering (SE) Dulohery Weeks Engineers (MEP) Gueoming Lin (geotechnical engineer) New South Construction (GC, CM) DETAILS 19,782 sf Total cost $18.5 million Construction time June 2013 to November 2017 Delivery method Design-negotiate-build
CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE
Related Stories
Reconstruction Awards | Dec 19, 2019
BD+C's 2019 Reconstruction Award Winners
The Museum at the Gateway Arch, the Senate of Canada building, and Google, Spruce Goose are just a few of the projects recognized with 2019 Reconstruction Awards.
Reconstruction Awards | Dec 13, 2019
A manse makeover: The Dahod Family Alumni Center at the Castle
A 1915 castle on BU’s campus is carefully restored for alumni events.
Reconstruction Awards | Dec 13, 2019
Community effort: Rose Collaborative
This post-Katrina project has become a citadel of the arts and education in the Crescent City.
Reconstruction Awards | Dec 12, 2019
New flight pattern: Google, Spruce Goose
The hangar that once housed the Spruce Goose is adapted to meet a tech giant’s workplace needs.
Reconstruction Awards | Dec 10, 2019
Enter the world of deep time: David H. Koch Hall of Fossils
The new enclosed FossiLab gives visitors a glimpse into the exacting work of Smithsonian scientists and preservationists.
Reconstruction Awards | Dec 6, 2019
TWA Hotel at JFK International Airport: Home away from home
A dormant, 1960s-era flight center is converted into a snazzy hotel and conference facility.
Reconstruction Awards | Dec 6, 2019
Columbus Metro Library Hilliard Branch
Senior living clubhouse becomes a modern library in central Ohio.
Reconstruction Awards | Dec 5, 2019
The 428: St. Paul's office corner
A long-forgotten five-and-dime store becomes a speculative office property in Minnesota’s capital.
Reconstruction Awards | Dec 4, 2019
The squeeze is on: The Revolution Hotel
Once a 1950s-era YWCA, The Revolution is now a hip new hotel in The Hub.
Reconstruction Awards | Dec 2, 2019
Hudson Commons: Over the top
A project team converts a 1960s industrial structure into a Class A office gem.