flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Gilbane to acquire W.G. Mills, Inc.

Gilbane to acquire W.G. Mills, Inc.


November 15, 2010

Rhode Island-based Gilbane Building Company, one of the nation’s leading providers of Construction Management and related services, announced today plans to acquire W.G. Mills, Inc., a construction management firm with operations based in Florida. The acquisition will dramatically strengthen Gilbane’s position in Florida’s growing market and complement its already established presence in the southeast.

“The Mills firm is a good fit for Gilbane both geographically and strategically,” says Thomas F. Gilbane, Jr., chairman and CEO. “Both companies are completely focused on client satisfaction and many of the markets we serve overlap. This newest addition to the Gilbane family of services makes us stronger and adds depth to our capabilities.”

The merger of W.G. Mills into Gilbane will leverage Gilbane’s national knowledge base, financial depth and employee training to enable the Mills operations to deliver even larger and more sophisticated projects to its broad Florida client base.

W.G. Mills is a major player in the state of Florida with seven offices and enjoys a reputation for exceeding clients’ expectations. With 155 employees and annual revenue of $250 million, the firm is active in a variety of construction sectors, including educational facilities, commercial, retail, health care, hospitality, and recreational facilities. Offering all types of delivery approaches over the past 38 years, W.G Mills has achieved significant growth in the Florida region in large part due to a repeat client-base.

“We began working with Gilbane as a joint venture partner and recognized right away that our companies were a perfect fit. We are both privately owned and both have an intense focus on taking care of our customers,” says Lemuel Sharp III, President of W.G. Mills. “For us, it’s all about people and forming deep client relationships, and Gilbane shares these same values.”

W.G. Mills, Inc. will become an integrated part of Gilbane’s current operations, serving as the company’s Florida region and operating under the name Mills Gilbane. The W.G. Mills management team will remain in place, with Sharp becoming Senior Vice President and Regional Manager of Gilbane’s new Florida regional office. The acquisition is expected to be complete December 1, 2010, subject to satisfactory completion of due diligence currently in progress.

 

About Gilbane Building Company

Gilbane Building Company provides a full slate of construction and facilities-related services –from sustainable building to the latest in construction technology – for clients across various markets. Founded in 1873 and still a privately held, family-run company, Gilbane has more than 40 office locations across the country and an international presence through its subsidiary, Innovative Technology Solutions, Inc. (ITSI). Acquired by Gilbane in August 2010, ITSI is an international, award-winning, design-build infrastructure and environmental solutions firm focused on Department of Defense and Department of Energy work.  For more information, visit http://www.gilbaneco.comhttp://www.gilbaneco.com.

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021