Drawing on experts we’ve interviewed over the past several months, this inaugural report forecasts what our editors believe will be the prevailing trends next year, and what factors could potentially impact those trends, positively or negatively.
Our predictions touch on how the worldwide supply chain, labor availability, and climate change will affect construction demand, materials choices, and the industry’s search for technological answers. The coronavirus pandemic has given new life and purpose to certain building types and has altered how others are designed and function, perhaps permanently. Outcries for greater diversity and inclusion are also reshaping firms’ projects and personnel.
Our 10 Predictions report is part of our magazine’s ongoing mission to keep our readers informed and connect the dots to help firms prosper in this competitive and challenging environment.
Click here to download BD+C’s 10 Predictions for the Construction Industry in 2022 (short registration required)
Related Stories
| Apr 12, 2012
Solar PV carport, electrical charging stations unveiled in California
Project contractor Oltman Construction noted that the carport provides shaded area for 940 car stalls and generates 2 MW DC of electric power.
| Apr 11, 2012
Shawmut appoints Tripp as business development director
Tripp joined Shawmut in 1998 and previously held the positions of assistant superintendent, superintendent, and national construction manager.
| Apr 11, 2012
Corgan & SOM awarded contract to design SSA National Support Center
The new SSA campus is expected to meet all Federal energy and water conservation goals while achieving LEED Gold Certification from the United States Green Building Council.
| Apr 11, 2012
C.W. Driver completes Rec Center on CSUN campus
The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.
| Apr 10, 2012
JE Dunn completes two medical office buildings at St. Anthony’s Lakewood, Colo. campus
Designed by Davis Partnership Architects, P.C., Medical Plaza 1 and 2 are four-story structures totaling 96,804-sf and 101,581-sf respectively.
| Apr 10, 2012
THINK [about architecture] Scholarship enters 15th year
Students are invited to submit two-minute creative videos that illustrate how they interact with their school's design and what the space makes possible.
| Apr 10, 2012
Structured Development & Bucksbaum close on new retail site in Chicago
The site is the location of New City, a mixed-use development that will feature 370,000-sf of retail space and 280 residential rental units.
| Apr 10, 2012
Moriarty & Associates selected as GC for Miami’s BrickellHouse Condo
Construction of the 46-story development is schedule to get underway this summer and be completed in 2014.