flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Concept from Perkins+Will could become the world’s tallest timber tower

Wood

Concept from Perkins+Will could become the world’s tallest timber tower

River Beech Tower is said to be a part of a masterplan along the Chicago River.


By David Malone, Associate Editor | October 13, 2016

Rendering courtesy of Perkins + Will

A collaboration between Perkins + Will, Thornton Tomasetti, and the University of Cambridge has produced a conceptual academic and professional design for an 80-story residential timber high-rise.

The high-rise, known as River Beech Tower, is part of a masterplan along the Chicago River, and while it is considered conceptual at the moment, the team says it could be realized by the time of the masterplan’s final phases, ArchDaily reports.

If the building does come to fruition, it would become the largest timber structure in the world. Most timber high-rise proposals reach between 30 to 40 stories with timber structures that are actually being constructed coming in between 10 and 20 stories. While 80 stories seems like a bit of a stretch considering what is currently possible, the River Beech team says a new, innovative system the tower’s construction would employ would allow them to reach new heights.

Currently, most timber buildings use a hybrid system of cross-laminated timber and glulam with a concrete core. Other models use a wooden core and wooden floor slabs with steel beams to provide ductility. But River beech Tower would use an entirely different system.

An exterior diagrid system would be used to take advantage of the natural axial strength of timber. In this system, the vertical and lateral loads are resisted by connecting the outer diagrids with the internal cross bracing that skirts the central atrium. This allows for efficient load distribution across all timber elements.

The building would likely have around 300 residential units along with communal spaces.

 

Rendering courtesy of Perkins + Will.

 

Rendering courtesy of Perkins + Will.

Related Stories

High-rise Construction | Jan 18, 2019

‘Paramount’ will become Nashville’s tallest tower

Goettsch Partners is the project’s architect.

High-rise Construction | Jan 14, 2019

AS+GG-designed tower will be the tallest in China

The tower is at the center of the Shimao Longgang Master Plan.

High-rise Construction | Jan 10, 2019

Indoor-outdoor amenities open leasing value at a San Francisco skyscraper

The amenities that set this 605-foot-tall building apart are its 50,000 sf of outdoor and open spaces that include 14 skydecks and large terraces on its 12th and 28th floors.

High-rise Construction | Dec 13, 2018

Record number of 'supertall' towers were completed in 2018

Citic Tower in Beijing and Vincom Landmark 81 in Ho Chi Minh City are among 18 "supertall" skyscrapers completed this year—a record number, according to the Council on Tall Buildings and Urban Habitat. 

High-rise Construction | Aug 27, 2018

The world’s tallest buildings with dampers

The CTBUH created the list as part of a recent study.

High-rise Construction | Aug 8, 2018

Bjarke Ingels Group’s new Shenzhen tower includes a folded building envelope

The new skyscraper is the home of Shenzhen Energy Company.

Multifamily Housing | Aug 7, 2018

Even after redevelopment, the iconic 'Chicago Tribune' sign will remain at 435 N. Michigan Ave.

The newspaper and the building's new owners reached a settlement.

Lighting | Aug 1, 2018

Willis Tower upgrades antenna lighting

The new lights will save Willis Tower more than 70% in antenna-lighting energy costs.

High-rise Construction | Jul 31, 2018

A 350-foot waterfall splashes down from a skyscraper in China

The tower is located in Guiyang’s central business district.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021