flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Cincinnati Reds debut renovated Reds Hall of Fame and Museum

Museums

Cincinnati Reds debut renovated Reds Hall of Fame and Museum

FRCH NELSON designed the project.


By David Malone, Associate Editor | August 21, 2019
The Reds Hall of Fame and Museum

All photos: Studio Thirteen

In honor of 150 years of Cincinnati Reds baseball, the team, in partnership with FRCH NELSON, renovated the Reds Hall of Fame and Museum. The $5 million project renovated over 15,000 sf of the largest team Hall of Fame in Major League Baseball to create a more organized and engaging visitor experience.

The museum’s collection was rearranged in a progressive order and the experience was enhanced by incorporating environmental graphics, adding new artifacts, and integrating touchscreen technology to increase engagement. The space was reconfigured into six unique galleries, which each highlighting different aspects of the team’s history and comprising over 7,000 team artifacts.

 

Reds hall of fame and museum

 

The 1869 room is dedicated to the team’s 150th anniversary, followed by a timeline gallery that allows visitors to chronologically follow the team and players’ milestones throughout history. Interactive opportunities include the Marty and Joe Broadcasting Exhibit and a digital baseball card station where visitors can create their own personalized card.

 

A statue in the Reds Hall of Fame and Museum

 

The 360 degree cinema plaque room is a guest-operated space that shares the stories of each Reds Hall of Fame inductee. The museum experience culminates with the Williams Family Champions Gallery, which celebrates the team’s five World Series Championships with amplified floor-to-ceiling media, curated memorabilia, and a flexible event bar.

 

See Also: Calgary’s sports and entertainment district will include the Calgary Flames’ new arena

 

The museum is open year-round on game days and non-game days.

 

Reds Hall of Fame baseball card archive

 

The Marty and Joe Broadcasting Exhibit

 

The Reds Marty and Joe broadcasting exhibit

 

The Williams Family Champions Gallery

Tags

Related Stories

| Aug 21, 2013

First look: Petersen Automotive Museum's dramatic facelift

One of the world's largest automotive museums unveils plans for a stunning, sculptured metal exterior and cutting-edge interior upgrades. 

| Aug 14, 2013

Green Building Report [2013 Giants 300 Report]

Building Design+Construction's rankings of the nation's largest green design and construction firms. 

| Jul 29, 2013

2013 Giants 300 Report

The editors of Building Design+Construction magazine present the findings of the annual Giants 300 Report, which ranks the leading firms in the AEC industry.

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 22, 2013

Cultural Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 2, 2013

LEED v4 gets green light, will launch this fall

The U.S. Green Building Council membership has voted to adopt LEED v4, the next update to the world’s premier green building rating system.

| Jul 1, 2013

Report: Global construction market to reach $15 trillion by 2025

A new report released today forecasts the volume of construction output will grow by more than 70% to $15 trillion worldwide by 2025.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




Museums

Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion

In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021