flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

High-rise Construction

Casablanca Finance City Tower becomes Morphosis’ first project in Africa

The tower is the first building completed in Casablanca Finance City.


By David Malone, Associate Editor | January 20, 2021
CFC Tower exterior at night

All photos: Jasmine Park

The 25-story Casablanca Finance City Tower has become the first project to be completed in the newly-established Casablanca Finance City, a new business district being developed in Morocco's Anfa District.

The Casablanca Finance City Tower’s design draws on the openness of the surrounding area, which gave the designers the opportunity in an otherwise dense city to highlight the relationship between the building and the natural environment. 

 

CFC facade

 

“The Casablanca Finance City Tower and its innovative design was conceived to have long-lasting impact and to signal a new era of economic prosperity for Morocco,” said Morphosis Founding Partner Thom Mayne in a release. “This tower brings together a range of global industries in the heart of the country, galvanizing international investment in North Africa, while also providing a template for the future development of the district as it continues to grow.”

 

Casablanca City Finance Tower interior elevator

 

A brise-soleil system wraps the building to protect against the sun while allowing the building to harness external elements to regulate natural light, air, and temperatures internally. The facade draws inspiration from traditional geometric patterned mosaics and wooden latticework screens characteristic of Moroccan architecture.

A tapered crown tops the 400-foot structure, while at street level the building engages the lower urban landscape with exterior public programming that invites the community into adjacent public spaces. This allows the building to serve as both a symbol of the city’s development and as a social hub that nurtures an active street life in the district.

Casablanca Finance City Tower is designed to achieve all LEED Gold certification.

 

CFC Tower ground level exterior

Related Stories

| Dec 14, 2011

Belfer Research Building tops out in New York

Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.

| Dec 12, 2011

AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year

SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment. 

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 22, 2011

Suffolk Construction selected as contractor for Boston luxury residential tower

Project team breaks ground on 488,000-sf building that will feature world-class amenities.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Oct 20, 2011

Johnson Controls appoints Wojciechowski to lead real estate and facilities management business for Global Technology sector

Wojciechowski will be responsible for leading the continued growth of the technology vertical market, while building on the expertise the company has developed serving multinational technology companies. 

| Oct 18, 2011

Michel Bruneau wins 2012 AISC T.R. Higgins Award

The AISC T.R. Higgins Lectureship Award is presented annually by the American Institute of Steel Construction (AISC) and recognizes an outstanding lecturer and author whose technical paper(s) are considered an outstanding contribution to the engineering literature on fabricated structural steel. 

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021