Brown University in Providence, R.I., earlier this month celebrated the virtual topping off of a 96,000-sf wellness center and 162-bed residence hall that, when they open for the fall semester in 2021, will be inside the first new building in Brown’s housing portfolio in 30 years.
The facility is designed to meet LEED v4 Silver standards using Fitwel and WELL certification systems as guidelines. The building will bring together several services for student mental and physical wellbeing, including Health Services, Counseling and Psychological Services, Brown Emergency Medical Services, and BWell, the university’s health promotion program.
The project is part of a strategic sourcing program between Brown University and the construction management firm Shawmut Design and Construction, which is completing this building in partnership with the architecture firm William Rawn Associates. Brown states on its website that the building is a prototype implementation of the vision and principles underlying the university’s Undergraduate Housing Master Plan update (2018).
STEEL-MASS TIMBER STRUCTURE
This photo shows the exterior construction progress that includes a cross-laminated timber deck. Image: Shawmut
The building features a hybrid system of steel framing and cross-laminated timber that will lower the structure’s carbon footprint. The building’s approach to sustainability make it “a one-of-a-kind residential and academic experience that will be a model for holistic student learning and engagement,” said Ron Simoneau, Shawmut’s executive vice president of Education, in a prepared statement.
This project’s Building Team includes LeMessurier Consultants (SE), Vanasse Hangen Brustline (CE), Stephen Stimon Associates (landscape), Accentech (acoustics), Jensen Hughes (code/fire alarm/fire protection), The Green Engineer (sustainability), Adelman and Lelek Engineering (energy modeling), GZA Environmental (Geotech), Environmental Systems (HVAC), Sterling Engineering (EE), and Harry Grodsky & Co. (PE).
The residence hall, on the upper floors of the building, will include a mix of single bedrooms and four-person suites. The health services will be co-located on the lower floors along with the student-led EMS department. (The building will have five floors on its south side, where the ambulance bay is located, and four floors on its north side. The site slopes 12.5 ft from south to north.)
COVID-19 RISK MITIGATION PROTOCOLS
A rendering of Brown University's new Wellness Center and residence hall, which will be ready for the 2021 fall semester. Image: William Rawn Associates
The building will have natural wood ceilings and a visible wood deck. All building systems are electric, and mechanical systems will have energy recovery technology, aligning with Brown’s pledge to reduce campus greenhouse gas emissions to net-zero by 2040.
On this project, Shawmut has rolled out new procedures to minimize the potential risk from the coronavirus. These include protocols such as Shawmut Vitals, a custom technology platform that allows team members to self-certify daily health screenings by scanning a job-specific QR code and completing a health survey. Workers have their temperatures before being allowed onsite and are issued personal protection equipment.
A spokesperson for Shawmut tells BD+C that the Building Team was still reviewing possible adjustments to the building’s design that would abet infection control. The building already incorporates a “ramped up” air ventilation and filtration system with the wellness center integration, this spokesperson says.
Neither Brown University nor Shawmut disclosed the cost of this building.
Related Stories
Coronavirus | Apr 2, 2020
COVID-19: CannonDesign initiates industry coalition to make masks for healthcare providers
Coalition formed to make DIY face masks for healthcare workers in COVID-19 settings.
Coronavirus | Apr 2, 2020
As virus spreads across North America, software providers step up with cost-free offerings
The goal is to keep construction projects moving forward at a time when jobs are being postponed or canceled.
Coronavirus | Apr 2, 2020
SBA and Treasury begin effort to distribute $349 billion in emergency small business capital
The new loan program will help small businesses with their payroll and other business operating expenses.
Coronavirus | Apr 2, 2020
New webinar explains how AIA Contract Documents can address business disruptions due to Covid-19
The webinar was recorded March 27.
Coronavirus | Apr 2, 2020
Informed by its latest Crane Index, Rider Levett Bucknall anticipates the effect of coronavirus on the construction industry
While total crane count holds steady, turbulent economic conditions indicate a recession-based drop in construction costs.
Coronavirus | Apr 1, 2020
How is the coronavirus outbreak impacting your firm's projects?
Please take BD+C's three-minute poll on the AEC business impacts from the coronavirus outbreak.
Coronavirus | Apr 1, 2020
Opinion: What can we learn from the coronavirus pandemic?
The coronavirus pandemic will soon end, soon be in the rear-view mirror, but we can still take lessons learned as directions for going forward.
Coronavirus | Apr 1, 2020
Three reasons you should keep sewing face masks (as long as you follow simple best practices)
Here are three reasons to encourage sewists coast to coast to keep their foot on the pedal.
Coronavirus | Apr 1, 2020
TLC’s Michael Sheerin offers guidance on ventilation in COVID-19 healthcare settings
Ventilation engineering guidance for COVID-19 patient rooms
Coronavirus | Apr 1, 2020
February rise in construction outlays contrasts with pandemic-driven collapse in March as owners, government orders shut down projects
Survey finds contractors face shortages of materials and workers, delivery delays and cancellations.