flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Architectural leaders join Gehry to form strategic alliance

Architectural leaders join Gehry to form strategic alliance


By By BD+C Staff | October 18, 2011
This group will work collectively with GT to realize and demonstrate better ways of achieving project outcomes: higher quality,

Gehry Technologies (GT) announced that co-founder and chairman, Frank Gehry, has brought together architects and designers to form a strategic alliance furthering his vision to transform the building industry and the practice of design. As part of today’s announcement, this core group of renowned architects will also serve on Gehry Technologies’ board of advisors.

The alliance intends to enable new approaches to design through technology, to create more effective industry processes and a higher quality built environment. By applying and innovating new technology solutions to old problems such as waste, delay, and miscommunication, this new alliance will lead the process change that the AEC industry needs to confront future challenges. The group represents a new type of professional organization for the 21stcentury, one which embraces the possibility of technology to empower design. The alliance will work together to drive technology innovations that support the central role of design in the creation of culture.

This group will work collectively with GT to realize and demonstrate better ways of achieving project outcomes: higher quality, more efficient, and cost effective projects. Most importantly, the alliance wants to ensure a context for professional work where the best designs and the best facilities can be realized. GT’s management team—led by CEO Dayne Myers—will be bolstered with the unprecedented experience and strategic guidance of the world’s leading architects, builders and visionaries. They will test, use and support emerging GT innovations and high-profile projects; participate in marketing and public relations initiatives; and catalyze AEC industry change.”

Initial alliance and board members include:

  • David Childs, the Chairman Emeritus of Skidmore, Owings & Merrill (SOM) 
  • Massimo Colomban, the Founder of Permasteelisa.com Group
  • Zaha Hadid is founder of Zaha Hadid Architects  
  • Greg Lynn, known for designing the New York Presbyterian Church in Queens, New Yor
  • Laurie Olin, a distinguished teacher, author, and one of the most renowned landscape architects practicing today
  • Wolf D. Prix, a co-founder, Design Principal, and CEO of COOP HIMMELB(L)AU
  • David Rockwell, founder of Rockwell Group
  • Moshe Safdie, a renowned international architect, urban planner, and author 
  • Matthias Schuler, one of the managing directors of TRANSSOLAR Energietechnik
  • Patrik Schumacher, a designer at Zaha Hadid Architects since 1988
  • Ben van Berkelis the co-founder of UNStudi
  • Richard Saul Wurman, described by Fortune magazine as an “intellectual hedonist” with a “hummingbird mind".

The advisors will come together today for their inaugural meeting, which will take place at the Freedom Tower in New York. Discussion topics will include: demonstrations of new GT technologies and initiatives; the future of design; and the role of technology in design. BD+C

Related Stories

Standards | Apr 22, 2024

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.

Building Materials | Apr 22, 2024

Tacoma, Wash., investigating policy to reuse and recycle building materials

Tacoma, Wash., recently initiated a study to find ways to increase building material reuse through deconstruction and salvage. The city council unanimously voted to direct the city manager to investigate deconstruction options and estimate costs. 

Student Housing | Apr 19, 2024

$115 million Cal State Long Beach student housing project will add 424 beds

A new $115 million project recently broke ground at California State University, Long Beach (CSULB) that will add housing for 424 students at below-market rates. The 108,000 sf La Playa Residence Hall, funded by the State of California’s Higher Education Student Housing Grant Program, will consist of three five-story structures connected by bridges.

Construction Costs | Apr 18, 2024

New download: BD+C's April 2024 Market Intelligence Report

Building Design+Construction's monthly Market Intelligence Report offers a snapshot of the health of the U.S. building construction industry, including the commercial, multifamily, institutional, and industrial building sectors. This report tracks the latest metrics related to construction spending, demand for design services, contractor backlogs, and material price trends.

MFPRO+ New Projects | Apr 16, 2024

Marvel-designed Gowanus Green will offer 955 affordable rental units in Brooklyn

The community consists of approximately 955 units of 100% affordable housing, 28,000 sf of neighborhood service retail and community space, a site for a new public school, and a new 1.5-acre public park.

Construction Costs | Apr 16, 2024

How the new prevailing wage calculation will impact construction labor costs

Looking ahead to 2024 and beyond, two pivotal changes in federal construction labor dynamics are likely to exacerbate increasing construction labor costs, according to Gordian's Samuel Giffin.

Healthcare Facilities | Apr 16, 2024

Mexico’s ‘premier private academic health center’ under design

The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.

Market Data | Apr 16, 2024

The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024

Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.

Laboratories | Apr 15, 2024

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.

Codes and Standards | Apr 12, 2024

ICC eliminates building electrification provisions from 2024 update

The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021