flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

AIA revises architect scope documents in latest contract form release

Codes and Standards

AIA revises architect scope documents in latest contract form release

Design-bid-build forms last updated in 2007.


By Peter Fabris, Contributing Editor | October 30, 2017

The American Institute of Architects (AIA) has released the second part of the 2017 edition of the A201 design-bid-build family of documents.

The contract forms are updated once every 10 years. This release includes updated versions of the Architect Scope documents and many frequently-used AIA forms. “We revised several of our most frequently used project forms, in part to coordinate them with other recently revised documents, but also to make them more efficient and user-friendly,” says Mike Koger, AIA, Esq., Manager and Counsel of AIA Contract Documents.

The updates include provisions related to things that go beyond basic architectural services. These “extra” services have become more prevalent in the industry in recent years and the updated documents include extensively revised architect scope documents to reflect this trend.

Major changes to Architect Scope documents include items related to:

  • Site Evaluation and Project Feasibility Services
  • Historic Preservation Services
  • On-Site Project Representation Services
  • Facility Support Services
  • Commissioning Services

 

Notable form changes include:

  • Certificate of Substantial Completion. Reorganized so the architect can sign the form, and include the date of substantial completion, immediately after the description of the work the architect is certifying.
  • Notice of Additional Services. Updated to allow an architect to satisfy the additional services notice requirements included in B101-2017, B103-2017, and B104-2017.
  • Amendment to the Professional Services Agreement. Revised to simplify the process to amend owner/architect agreements when additional services are not contemplated as part of the amendment. For such amendments, the owner and architect need only to describe the amendment, indicate changes to the architect’s compensation and schedule, and execute G802-2017 according to the underlying owner/architect agreement.

 

Visit www.aiacontracts.org/purchase for more information. Comparative versions showing the differences between the 2017 and 2007 editions are also available at www.aiacontracts.org/learn.

Related Stories

| Sep 8, 2011

OSHA issues alert on incorrectly rebuilt circuit breakers

The Occupational Safety and Health Administration (OSHA) has issued a hazard alert, warning workers and employers of certain Eaton/Cutler-Hammer molded-case circuit breakers that were incorrectly rebuilt. 

| Sep 8, 2011

USGBC Streamlines LEED EB: O&M

The Council has reorganized the prerequisite and credit structure of LEED EB: O&M. 

| Sep 8, 2011

USGBC: 30 Legislative ‘Wins For Green Building’ So Far In 2011

A mid-year report by the U.S. Green Building Council says that there have been “30 legislative wins for green building” across 22 states in 2011. 

| Sep 8, 2011

Revised Building Codes Adopted After WTC Attacks Being Implemented

U.S. National Institute of Standards and Technology (NIST) code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction including One World Trade Center, the lead building of the new World Trade Center complex. 

| Sep 8, 2011

New Sustainability Standard Addresses Disaster Resistance

To aid local governments to adopt high-performance green building codes, the Portland Cement Association (PCA) and the Institute for Business and Home Safety (IBHS) have developed High Performance Building Requirements for Sustainability 2.0. 

| Sep 8, 2011

Pilot ISO 50001 Implementations Report Big Energy Savings

The International Organization for Standardization (ISO) recently published ISO 50001 to provide a recognized framework for integrating energy performance into management practices. 

| Sep 8, 2011

USGBC Revises Energy Demand Response Credit

Originally launched in 2010, the revised and enhanced Demand Response Pilot Credit establishes guidelines that are anticipated to increase participation in automated energy demand response programs.  

| Sep 8, 2011

Water Safety in Buildings Guide Published by World Health Organization (WHO)

This WHO book provides guidance for managing water supplies in buildings where people may drink water, use water for food preparation, wash, shower, swim or use water for other recreational activities or be exposed to aerosols produced by water-using devices, such as cooling towers. 

| Sep 7, 2011

NFPA Fire & Life Safety Conference in December

Presentations on recent Fire Protection Research Foundation projects, how September 11th and the Triangle Shirtwaist Factory fire affected high rise design, and a panel discussion on emerging code issues will be featured at the National Fire Protection Association (NFPA)’s Fire & Life Safety Conference on December 12-14 in Orlando, FL.The meeting will include more than 60 educational sessions in which participants can earn continuing education units (CEUs). Presentations will be led by NFPA staff experts and technical committee members, and will be organized in four tracks – building and life safety, detection and alarm, fire suppression, and codes and standards. For more information, visit www.nfpa.org/FLSCONF.  

| Sep 1, 2011

Project Aims to Automate Code Compliance Assessment

FIATECH, a consortium of owners from the industrial, power, and retail markets that build large structures, launched a project this year to validate the use of automation technology for code compliance assessment, and to accelerate the regulatory approval process using building models. Long-term objectives include the development of an extensive, open-source rule set library that is approved by industry and regulatory bodies for use by technology developers and code officials.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021