flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

AIA launches stalled projects database

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.


By By BD+C Staff | November 29, 2011
AIA stalled projects database
The stalled projects website helps address one of the persistent impediments facing the design and construction sector, which ac
This article first appeared in the December 2011 issue of BD+C.

The American Institute of Architects (AIA) announced that it has launched an online database that will let developers and architects network with investors interested in lending to projects that have been stalled primarily due to lack of financing.

The AIA designed the database, housed at www.aia.org/stalledprojects, to help address one of the persistent impediments facing the design and construction sector, which accounts for $1 in $9 of U.S. Gross Domestic Product, according to the U.S. Census Bureau. Each $1 million in new construction spending supports 28.5 full-time, year-round-equivalent jobs, according to a study by George Mason University economist Stephen J. Fuller.

“In large part the fortunes of the entire U.S. economy rest on whether the design and construction industry can create jobs,” said AIA President Clark Manus, FAIA. “For months, our industry has continued to suffer primarily because banks won’t lend. With this unprecedented online database portal, the AIA has decided to do something that could create more jobs and help grow the economy.”

The credit crunch crisis in design and construction shows no signs of abating. A report issued by the AIA’s economics and market research group finds that the share of projects stalled due to financing problems through August 2011 has almost doubled since 2008 and that one-in-five stalled projects directly result from financing problems. Indeed, almost two-thirds of architects responding to a May AIA survey reported at least one project stalled due to lack of financing.

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals. Since going live on October 31, the site has attracted projects seeking a total of almost $230 million in financing. The AIA expects these numbers to grow as word spreads throughout the architecture profession about this initiative.

“The four-month project to create this one-of-a-kind portal represents a comprehensive, intense effort by this organization to address an issue of vital importance to our members and to the economy in general,” said the AIA’s EVP and Chief Executive Officer Robert Ivy, FAIA. “As this initiative takes hold, we hope that the AIA’s Stalled Projects Page will prove to be an immense asset to architects, builders and developers throughout the country.”

By creating a login and clicking inside the “Get Started Now” box on the site, architects and developers can fill out a form and tell investors about their projects. By clicking in that same box, investors list their companies and tell project leaders about their firms and the types of investments they are interested in making. Once registered, both project owner and investor can see details on stalled projects or peruse investor information. BD+C

Related Stories

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

Industrial Facilities | Apr 9, 2024

Confessions of a cold storage architect

Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

Green | Apr 8, 2024

LEED v5 released for public comment

The U.S. Green Building Council (USGBC) has opened the first public comment period for the first draft of LEED v5. The new version of the LEED green building rating system will drive deep decarbonization, quality of life improvements, and ecological conservation and restoration, USGBC says. 

Codes and Standards | Apr 8, 2024

Boston’s plans to hold back rising seawater stall amid real estate slowdown

Boston has placed significant aspects of its plan to protect the city from rising sea levels on the actions of private developers. Amid a post-Covid commercial development slump, though, efforts to build protective infrastructure have stalled.

Sustainability | Apr 8, 2024

3 sustainable design decisions to make early

In her experience as an architect, Megan Valentine AIA, LEED AP, NCARB, WELL AP, Fitwel, Director of Sustainability, KTGY has found three impactful sustainable design decisions: site selection, massing and orientation, and proper window-to-wall ratios.

Brick and Masonry | Apr 4, 2024

Best in brick buildings: 9 projects take top honors in the Brick in Architecture Awards

The Ace Hotel Toronto, designed by Shim-Sutcliffe Architects, and the TCU Music Center by Bora Architecture & Interiors are among nine "Best in Class" winners and 44 overall winners in the Brick Industry Association's 2023 Brick in Architecture Awards.

boombox1 - default
boombox2 -
native1 -

More In Category

MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021