Early results from MULTIFAMILY Design+Construction's inaugural Kitchen + Bath survey of multifamily developers, architects, contractors, and other specifiers make it clear that supply chain problems are impacting apartment, condo, and townhome projects.
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
HOW COVID, UKRAINE WAR ARE IMPACTING SPECIFIERS
We asked: "What K+B amenities have you had DIFFICULTY SOURCING due to the Covid pandemic or Ukraine war? What are you doing about this?"
Appliances came up more often than any other product category. "We've been purchasing them early and storing in our own warehouses or changing our spec to purchase models that are in stock/available," said one respondent.
"It's been difficult getting appliance packages with the same manufacturer," said another respondent. "We're needing to mix manufacturers and appliances."
Yet another said, of appliances, "We're ordering early and being more flexible, less committed on specific brands or models."
"We had to take early delivery of the appliances (way ahead of schedule), because otherwise they'd be given to another project," said a respondent. "As a result, we had to find storage for the appliances."
Stackable washer/dryer combos were In short supply, according to one respondent.
THE GREAT REFRIGERATOR VANISHING ACT OF 2022
Refrigerators were the main culprit, according to early survey respondents. One respondent was very specific: "French door refrigerators."
But most would have been happy with any ol' fridge. "We're finding whatever spec is available," said a respondent. "Need to order well in advance and be flexible," advised another.
But the list of shortages was not limited to kitchen appliances. Tile products were a problem for one respondent: "We are having to respecify to domestic manufacturers."
Cabinets were also cited by several repondents. "Unfortunately, playing the waiting game," said a cabinetless respondent.
Another pleaded, "Trying to get locally sourced cabinets, made in the USA." Yet another said, "Diversifying [cabinet] suppliers."
WIDE RANGE OF K+B PRODUCTS STILL MISSING
Other amenities lost in the black hole of the supply chain:
- Vented fans with LED lights
- Porcelain tile
- Faucets
- Stone
- Electrical fixtures
- Plumbing fixtures
- Shower surrounds
- Fiberglass shower units
- Quartz countertops
- Solid surface materials for compartments
- Lighting
- Flooring
The last word on "solving" the K+B amenity shortage problem: "Order way in advance," advised one respondent.
LAST CHANCE TO ENTER FOR $50 GIFT CARD
The survey will close Friday, Oct 7, 2022 at 11:59pm CT, so take the survey now to be eligible for one of 10 $50 gift cards.
(Note: If you've already completed the survey there is no need to repeat it: You are entered in the drawing.)
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
Related Stories
| Nov 29, 2011
Suffolk Construction breaks ground on Boston residential tower
Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Oct 17, 2011
Austin's newest urban apartment complex under construction
Complex sits on a four-acre waterfront site along Lady Bird Lake with spectacular city and lake views, and is slated to open spring 2013.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 6, 2011
GREENBUILD 2011: NEXT Living EcoSuite showcased
Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.
| Sep 29, 2011
Kohler supports 2011 Solar Decathlon competition teams
Modular Architecture > In a quest to create the ultimate ‘green’ house, 20 collegiate teams compete in Washington D.C. Mall.
| Sep 23, 2011
$5M pledge renewed for Habitat for Humanity
The five-year commitment, which will run through 2015, includes $5 million of donated interior and exterior locks and keys for homes built with Habitat for Humanity homeowner partners and volunteers.
| Sep 23, 2011
Under 40 Leadership Summit
Building Design+Construction’s Under 40 Leadership Summit takes place October 26-28, 2011 Hotel at the Monteleone in New Orleans. Discounted hotel rate deadline: October 2, 2011.