Submissions are due April 13, 2012. Results will be published in the July 2012 issue of Building Design+Construction and additional coverage will be available online at www.bdcnetwork.com
If you're just getting started, please use this slightly updated version of the Giants 300 survey. Please note the new questions about "Industrial Buildings" in 4B and "NEW Construction vs. RECONSTRUCTION" in 5F.
Explanation of "public sector tab" in Giants 300 survey
Important point: how to allocate revenues in the "Public Sector" tab and the "Building Type" tab. If, for example, your firm did an office building for the State of New York, you would put the revenues your firm earned for that project in "Office Buildings" Building Type Tab 4B AND you would also count that same revenue in "State Government" in Public Sector Tab 4C.
Click here to download the 2012 Giants 300 Survey
Please email your completed survey to bdcGiants300@sgcmail.com. Only an Excel document will be accepted. DO NOT SEND in any other format (no PDFs, please).
If you need any help or have a question, contact Rob Cassidy at 847.391.1040 or rcassidy@sgcmail.com or Tim Gregorski at 847.954.7941 or tgregorski@sgcmail.com.
Seeking cover photo for July issue!
We are looking for that absolutely stunning, dazzling, inspiring photo of your best project (completed in 2011 or 2012). Your great project could wind up on the cover of the July issue of BD+C. Send it right away to Tim Gregorski at tgregorski@sgcmail.com.
The survey is also available for download directly below. BD+C
Related Stories
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Market Data | Apr 16, 2024
The average U.S. contractor has 8.2 months worth of construction work in the pipeline, as of March 2024
Associated Builders and Contractors reported today that its Construction Backlog Indicator increased to 8.2 months in March from 8.1 months in February, according to an ABC member survey conducted March 20 to April 3. The reading is down 0.5 months from March 2023.
Laboratories | Apr 15, 2024
HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus
In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.
Codes and Standards | Apr 12, 2024
ICC eliminates building electrification provisions from 2024 update
The International Code Council stripped out provisions from the 2024 update to the International Energy Conservation Code (IECC) that would have included beefed up circuitry for hooking up electric appliances and car chargers.
Urban Planning | Apr 12, 2024
Popular Denver e-bike voucher program aids carbon reduction goals
Denver’s e-bike voucher program that helps citizens pay for e-bikes, a component of the city’s carbon reduction plan, has proven extremely popular with residents. Earlier this year, Denver’s effort to get residents to swap some motor vehicle trips for bike trips ran out of vouchers in less than 10 minutes after the program opened to online applications.
Laboratories | Apr 12, 2024
Life science construction completions will peak this year, then drop off substantially
There will be a record amount of construction completions in the U.S. life science market in 2024, followed by a dramatic drop in 2025, according to CBRE. In 2024, 21.3 million sf of life science space will be completed in the 13 largest U.S. markets. That’s up from 13.9 million sf last year and 5.6 million sf in 2022.
Multifamily Housing | Apr 12, 2024
Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago
New 33-story Class A rental tower, designed by SCB, will offer 343 rental units.
Student Housing | Apr 12, 2024
Construction begins on Auburn University’s new first-year residence hall
The new first-year residence hall along Auburn University's Haley Concourse.
K-12 Schools | Apr 11, 2024
Eric Dinges named CEO of PBK
Eric Dinges named CEO of PBK Architects, Houston.
Construction Costs | Apr 11, 2024
Construction materials prices increase 0.4% in March 2024
Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.