flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Wayne State University Mike Ilitch School of Business Case Study

Sponsored Content Moisture Control/Building Envelope

Wayne State University Mike Ilitch School of Business Case Study

The Wayne State University Mike Ilitch School of Business qualified as an ABAA project and was checked for continuity, proper mil thickness, and sufficient adhesion testing.


By WR Meadows | June 25, 2018

Thanks to a $40 million lead investment from Mike and Marian Ilitch, the largest gift that was ever received by Wayne State University, WSU’s first entirely new construction building was able to become a reality. The Wayne State University Mike Ilitch School of Business started construction in 2016 in Detroit, Mich. The new facility, scheduled to open in 2018, offers an opportunity for students to be closer to Detroit’s business district, allowing for heightened internship and career possibilities.

In order for the new facility to stand up to the humid Detroit climate influenced by the great lakes with temperatures ranging from below-freezing in the winter to typically 90-degree weather in the summer, a tough air barrier was required. Architect SmithGroupJJR specified AIR-SHIELD LMP by W. R. MEADOWS to step up to the challenge and offer the necessary protection needed for a dependable building envelope.

AIR-SHIELD LMP is a water-based air and liquid moisture barrier that cures to form a durable, seamless, elastomeric membrane which exhibits excellent resistance to air leakage. AIR-SHIELD LMP prohibits liquid water intrusion into the substrate while allowing vapor to pass through it. AIR-SHIELD LMP is non-asphaltic and is designed to meet stringent fire code requirements, offering a heightened level of safety. The high flexibility of the material bridges cracks which may form once settling of the substrate occurs in new construction. AIR-SHIELD LMP’s self-sealing ability allows for nails and fasteners to be used without compromising its performance, aiding in construction efficiency. The product also offers excellent adhesion and remains firmly bonded to the substrate, even when applied over damp surfaces.

 

 

Contractor Industrial Services Inc. installed 43,000 square feet of black AIR-SHIELD LMP to complete the building envelope. AIR-SHIELD LMP is also offered in gray which must be covered within six months after being installed. The black membrane was selected for its ability to be left exposed for an indefinite period of time. Metal panel availability to cover the membrane in a timely manner was initially a concern during construction.

AIR-SHIELD LMP was spray-applied with appropriate airless spray equipment, allowing for a simple, low cost application. Single-component, water-based AIR-SHIELD LMP was safe for the construction crew to use and offered easy cleanup after the membrane was applied.

 

 

The Wayne State University Mike Ilitch School of Business qualified as an ABAA project and was checked for continuity, proper mil thickness, and sufficient adhesion testing.

The new four-story school of business building will offer thousands of students a facility that features a finance and data analytics lab, a two-story atrium, a large state-of-the-art auditorium, a rooftop terrace suitable for a variety of events, and interior educational service spaces for tutoring, advising, meetings, and more. The building’s proximity to Detroit’s Little Ceasars Arena will also allow for M.B.A. students to be submerged in a real-world sports entertainment environment. On the heels of constructing Wayne State University Mike Ilitch School of Business, the city plans on developing numerous residential and retail spaces to accommodate the millions of estimated annual visitors.

For more information, visit wrmeadows.com.

Related Stories

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021