Museum at the Gateway Arch: Subterranean sensation

Reconstruction Awards

Museum at the Gateway Arch: Subterranean sensation

The project team used its creativity to overcome floods and other obstacles to construction.


By John Caulfield, Senior Editor | November 14, 2019
The museum's west entrance

The west entrance of the museum is laid onto the landscape and inserted into the topography. All photos: Paul Colletti Photography/©IMEG Corp

Located at the base of the Gateway Arch, this underground museum explores seminal events in American history, such as the Louisiana Purchase and the Lewis and Clark expedition. The 46,000-sf addition and 100,000-sf renovation represented the facility’s first reconstruction work since the Museum of Westward Expansion opened in 1976.

The project team had to work mostly below ground and within the National Register–listed landscape. The Mississippi River flooded twice during construction.

The team traveled to Germany to review and approve the glass fabricator’s mockup of the canopy enclosure system for the new 2,000-sf west entrance. A reinforced cast-in-place post-tensioned concrete lid beam and slab system spans 80 feet over the museum addition.

Alper Audi and McCarthy Building Companies co-developed a concrete mockup with sensors that enabled the team to make sure that temperatures achieved during curing were within recommended tolerances for the 2,400 cubic yards of concrete that were used.

 

The mezzanineThe mezzanine features a giant map of North America where visitors can walk the path of explorers Lewis and Clark.

 

The project team routed ductwork and piping through a mechanical tunnel from the existing mechanical room to and through the exhibit level, up a vertical cast-in-place concrete chase in the mezzanine, and across an underground duct system at entry level.

MEP systems were overhauled and reconfigured, resulting in the removal of 11 of 15 heating units and adding new systems inside ground-level mechanical rooms for easier maintenance.

 

GOLD AWARD WINNER

BUILDING TEAM IMEG Corp. (submitting firm, ME, telecommunications engineer) National Park Service, Gateway Arch Park Foundation (owners) Michael Van Valkenburgh Associates (architect for City Arch River Initiative) Cooper Robertson (museum design architect) James Carpenter Design Associates, Trivers Associates (associate architects) Alper Audi (SE) KAI (PE) Castle Contracting (earthwork/utilities contractor) David Mason + Associates (CE) National Park Service Denver Service Center (PM) Eckersley O’Callaghan (façade engineer) Haley Sharpe Design (exhibit designer) Shen Milsom & Wilke (A/V) Tillotson Design Associates (lighting) Jaffe Holden (acoustics) Alpha Corporation (CM) McCarthy Building Companies (GC) DETAILS 146,000 sf Total cost $176.4 million Construction time April 2015 to June 2018 Delivery method Design-bid-build

Related Stories

Reconstruction Awards | Jan 6, 2021

University of Pennsylvania’s Stemmler Hall forgoes retrofit in favor of complete renovation

The Edward J. Stemmler Hall project has won a Bronze Award in BD+C’s 2020 Reconstruction Awards.

Reconstruction Awards | Dec 29, 2020

The reenvisioned Sazerac House: A delectable cocktail that's just perfect for the Big Easy

The 51,987-sf Sazerac House is an interactive cocktail museum, active distillery, corporate headquarters, and event venue, all under one roof, next to the historic French Quarter of New Orleans.

Reconstruction Awards | Dec 18, 2020

Can converting a landmark office to a clinic raise up a downtrodden Philadelphia neighborhood?

BD+C’s Reconstruction Awards recognize the adaptive reuse of the Kensington Trust building.

Reconstruction Awards | Dec 18, 2020

Spokane Riverfront Park U.S. Pavilion project creates a refreshed gathering place in Spokane

The project has won a Bronze Award in BD+C's 2020 Reconstruction Awards.

Reconstruction Awards | Dec 16, 2020

Voters resuscitate an abandoned high school in northern California

A 2014 bond issue provided financing to seismically stabilize and modernize Historic Alameda High School, a 2020 Silver Reconstruction Award winner.

Reconstruction Awards | Dec 14, 2020

Wyoming Capitol Square renovation project is all about the details

The Wyoming Capitol Square project has won a Gold Award in BD+C's 2020 Reconstruction Awards.

Reconstruction Awards | Dec 12, 2020

A famed dome of a historic glasshouse is revived to its rightful glory

Scaffolding played a critical role in the repair and restoration of the Enid A. Haupt Conservatory’s Palm Dome at the New York Botanical Gardens, a Gold winner of BD&C’s 2020 Reconstruction Awards

Reconstruction Awards | Dec 8, 2020

A synagogue in Toronto is renewed while preserving its history

Holy Blossom Temple is a Platinum winner in BD+C’s 2020 Reconstruction Awards.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021