flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Fire resistive transparent walls transform stairwells and exits to inviting, light-filled spaces

Sponsored Content Glass and Glazing

Fire resistive transparent walls transform stairwells and exits to inviting, light-filled spaces

To preserve the building’s open design and to extend natural light further in the building, the architects incorporated fire resistive glazing in the areas that required a 2-hour fire rating, particularly in the stairwells and exit passageways.


By SaftiFirst | March 16, 2017

ASTM E-119 rated fire resistive glass and framing in this 2-hour stairwell adds vision, transparency and a connection to the outdoors while meeting code requirements. 

Project Name:  Kent State University College of Architecture and Environmental Design in Kent, OH

Architects:  Weiss/Manfredi and Richard L. Bowen & Associates

Contract Glazier:  VIP Restoration

Products used:  SuperLite II-XL 120 in GPX Architectural Series Wall Framing


Dubbed as one of the most anticipated construction projects in all of Ohio, the new Kent State University College of Architecture and Environmental Design (CAED) finally held its grand opening reception last October 2016. This comes three years after Weiss/Manfredi in New York and Richard L. Bowen & Associates in Cleveland took first place in a field of 37 competitive entries in an international competition to design the new CAED building. 

The 120,000 square foot, four-story building features wide-open interior spaces that emulate industrial design lofts to encourage interaction and collaboration. Stairs figure prominently in the design and are used in both the north and south facades to connect all four levels. The exterior is a combination of warm orange-toned brick and expansive glass walls that maximize natural light.

To preserve the building’s open design and to extend natural light further in the building, the architects incorporated fire resistive glazing in the areas that required a 2-hour fire rating, particularly in the stairwells and exit passageways. USA-made SuperLite II-XL 120 in GPX Architectural Series Wall Framing were specified as the basis of design for its ability to meet the fire resistive ASTM E-119 wall criteria with hose stream for up to 2 hours while bringing vision, transparency and natural light further in the building. The clean, sharp edges and uniform sightlines of the GPX Architectural Series Wall Framing matched the appearance and clear anodized finish of the non-rated aluminum storefront systems used throughout the project.  

The result is a seamless, elegant design that encourages everyday use of the stairs.  In the past, stairwells were rarely used by building occupants because it was dark, windowless and closed off from view – making them prime areas for attack. Today’s well-designed stairways with transparent, fire resistive glass walls support design efforts to make stairs more visible, appealing and safe. Not only does stair climbing provide numerous health benefits, but saves energy, provides vertical flexibility and connectivity, and improves workplace efficiency and overall occupant safety.  

 

Light-filled, code compliant 2-hour fire resistive stairwells are possible with ASTM E-119 rated fire resistive glass and framing.  

 

Glazing can be used in 2-hour walls as long as the assembly meets the ASTM E-119 fire resistive wall criteria.  It may look like a window or opening, but it is actually a transparent wall. 

Related Stories

| Dec 20, 2011

Aragon Construction leading build-out of foursquare office

The modern, minimalist build-out will have elements of the foursquare “badges” in different aspects of the space, using glass, steel, and vibrantly painted gypsum board.

| Dec 10, 2011

10 Great Solutions

The editors of Building Design+Construction present 10 “Great Solutions” that highlight innovative technology and products that can be used to address some of the many problems Building Teams face in their day-to-day work. Readers are encouraged to submit entries for Great Solutions; if we use yours, you’ll receive a $25 gift certificate. Look for more Great Solutions in 2012 at: www.bdcnetwork.com/greatsolutions/2012.

| Dec 10, 2011

Turning Balconies Outside In

Operable glass balcony glazing systems provide solution to increase usable space in residential and commercial structures. 

| Dec 5, 2011

Summit Design+Build begins renovation of Chicago’s Esquire Theatre

The 33,000 square foot building will undergo an extensive structural remodel and core & shell build-out changing the building’s use from a movie theater to a high-end retail center.

| Dec 5, 2011

Fraser Brown MacKenna wins Green Gown Award

Working closely with staff at Queen Mary University of London, MEP Engineers Mott MacDonald, Cost Consultants Burnley Wilson Fish and main contractor Charter Construction, we developed a three-fold solution for the sustainable retrofit of the building.

| Nov 22, 2011

Jones Lang LaSalle completes construction of two new stores in Manhattan

Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.

| Nov 10, 2011

Skanska Moss to expand and renovate Greenville-Spartanburg International Airport

The multi-phase terminal improvement program consists of an overall expansion to the airport’s footprint and major renovations to the existing airport terminal.

| Oct 24, 2011

Kolbe adds 3-D models of direct set windows to BIM library?

Beveled Direct Set SketchUp and Revit Models available.

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

| Sep 23, 2011

Fire and hurricane rated glazed wall assemblies installed at multi-family residence in Florida

Fire and hurricane assemblies meet design and code requirements.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021