flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Vacant Dartmouth College building to become faculty and graduate student center

University Buildings

Vacant Dartmouth College building to become faculty and graduate student center

Leers Weinzapfel Associates designed the project.


By David Malone, Associate Editor | November 26, 2018
Dana Hall renovation and reconstruction

Rendering courtesy Leers Weinzapfel Associates

The vacant Dana Hall library building on Dartmouth College’s north campus was a 32,995-sf, 1960s building that became the anchor of the school’s north campus renewal plan. The building is being reimagined as a faculty and graduate student center.

Designed by Leers Weinzapfel Associates, the new building aspires for net zero energy use and will include new entrances for its surrounding buildings, a wide pedestrian bridge, and new circulation between buildings. The hope is the reimagined building will better connect the north campus to the green and main campus.

 

Dana Hall renovation orojectRendering courtesy Leers Weinzapfel Associates.

See Also: Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

 

An unused laboratory adjacent to Dana Hall will be demolished and an addition will be built in its place that houses the new building’s lobby and a cafe with a terrace overlooking a nearby green space. The renovated building’s upper floors will contain collegial faculty offices, classrooms, and places for student gathering. A penthouse level includes a solar paneled canopy and a south-facing planted terrace. In the basement there is a walk-out graduate student lounge that opens to a protected courtyard below a pedestrian bridge.

 

Dana Hall renovation projectRendering courtesy Leers Weinzapfel Associates.

 

Among the renovated buildings sustainability features are high R value terracotta-clad walls, solar panel canopy triple glazed windows, and south-facing glass with an expanded metal interlayer to limit summer sun. Before construction began, Dana Hall was stripped down to its concrete columns and slabs to remove existing hazardous materials.

The building is currently under construction and is slated to open for the 2020 Winter Term.

Related Stories

Reconstruction & Renovation | Aug 22, 2018

Former shopping mall becomes mixed-use urban complex in Beijing

Schmidt Hammer Lassen Architects designed the project.

Reconstruction & Renovation | Aug 21, 2018

The massive facelift of New York’s famed Waldorf Astoria moves into Phase Two

The refurbished hotel will feature fewer, but larger, guest rooms.

Codes and Standards | Jul 17, 2018

NIMBYism, generational divide threaten plan for net-zero village in St. Paul, Minn.

The ambitious redevelopment proposal for a former Ford automotive plant creates tension.

Mixed-Use | Jul 17, 2018

Water Street Tampa’s developer reveals details about this project’s public spaces

This $3 billion waterfront neighborhood will also include three hotels.

Urban Planning | Jul 6, 2018

This is Studio Gang's first design project in Canada

The building’s hexagonal façade will provide passive solar heating and cooling.

Reconstruction & Renovation | May 2, 2018

*UPDATED* Is Ford planning to purchase and renovate Detroit’s long-abandoned Michigan Central Station?

The vacant building has been at the center of many renovation proposals since it closed in 1988.

Reconstruction & Renovation | Mar 20, 2018

Former bank in Alabama becomes modern café

The building was originally built in 1955.

Reconstruction & Renovation | Mar 1, 2018

Manhattan’s Irish Hunger Memorial undergoes $5.3 million renovation

The team comprised Battery Park City Authority, CTA Architects, The LiRo Group, and Nicholson & Galloway.

Reconstruction & Renovation | Feb 7, 2018

Renovations begin on an underground facility that is investigating the nature of dark matter

This LEO A DALY-designed project makes way to produce the world’s most sensitive detector to this point.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021