flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Vacant Dartmouth College building to become faculty and graduate student center

University Buildings

Vacant Dartmouth College building to become faculty and graduate student center

Leers Weinzapfel Associates designed the project.


By David Malone, Associate Editor | November 26, 2018
Dana Hall renovation and reconstruction

Rendering courtesy Leers Weinzapfel Associates

The vacant Dana Hall library building on Dartmouth College’s north campus was a 32,995-sf, 1960s building that became the anchor of the school’s north campus renewal plan. The building is being reimagined as a faculty and graduate student center.

Designed by Leers Weinzapfel Associates, the new building aspires for net zero energy use and will include new entrances for its surrounding buildings, a wide pedestrian bridge, and new circulation between buildings. The hope is the reimagined building will better connect the north campus to the green and main campus.

 

Dana Hall renovation orojectRendering courtesy Leers Weinzapfel Associates.

See Also: Charles L. Tutt Library, Colorado College: Net-zero in the Rockies

 

An unused laboratory adjacent to Dana Hall will be demolished and an addition will be built in its place that houses the new building’s lobby and a cafe with a terrace overlooking a nearby green space. The renovated building’s upper floors will contain collegial faculty offices, classrooms, and places for student gathering. A penthouse level includes a solar paneled canopy and a south-facing planted terrace. In the basement there is a walk-out graduate student lounge that opens to a protected courtyard below a pedestrian bridge.

 

Dana Hall renovation projectRendering courtesy Leers Weinzapfel Associates.

 

Among the renovated buildings sustainability features are high R value terracotta-clad walls, solar panel canopy triple glazed windows, and south-facing glass with an expanded metal interlayer to limit summer sun. Before construction began, Dana Hall was stripped down to its concrete columns and slabs to remove existing hazardous materials.

The building is currently under construction and is slated to open for the 2020 Winter Term.

Related Stories

Mixed-Use | Oct 19, 2020

Commonwealth Pier revitalization project begins construction in Boston’s Seaport

CBT, in collaboration with Schmidt Hammer Lassen Architects designed the project.

Reconstruction & Renovation | Sep 30, 2020

SOM reimagines former Cook County Hospital into mixed-use destination

The project is the first phase of a proposed $1 billion redevelopment plan for the area in Chicago.

Multifamily Housing | Aug 24, 2020

Texaco’s century-old headquarters is now a luxury apartment community

After sitting vacant for nearly three decades, the former home of Texaco, Inc. has been converted into a 17-story, 286-unit apartment building in the heart of downtown Houston.

Reconstruction & Renovation | Aug 21, 2020

Reconstruction could be COVID-19’s silver lining

Existing buildings are being adapted to the ‘new normal’ for health and wellness.

Reconstruction & Renovation | Aug 20, 2020

Former jail to be reimagined and integrated into Dallas’s Harold Simmons Park

Weiss/Manfredi was selected as the design architect for the project.

Reconstruction & Renovation | Jun 8, 2020

Spacesmith will design sustainable production facilities for Upriver Studios in New York

The project will be located in Saugerties in upstate New York.

Coronavirus | Apr 9, 2020

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

COVID-19 alert: Robins & Morton to convert Miami Beach Convention Center into a 450-bed field hospital

Reconstruction & Renovation | Mar 3, 2020

Not so strange bedfellows: hybrid buildings in New York combine unlikely tenants

“Found money” for owners looking to monetize their air spaces, says FXCollaborative, which has designed several of these buildings.

Reconstruction & Renovation | Jan 16, 2020

Snøhetta’s 550 Madison Garden gains approval from NYC Planning Commission

The project previously gained approval from Manhattan Community Board 5 in December.

Reconstruction & Renovation | Nov 6, 2019

The silent giant: Reconstruction sector makes big impact on firms

More than a quarter of AEC firms that participated in the 2019 Giants 300 survey earned at least half of their total 2018 revenue from the reconstruction sector.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021