flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Top State Government Sector Architecture Firms [2013 Giants 300 Report]

Top State Government Sector Architecture Firms [2013 Giants 300 Report]

Stantec, Perkins+Will, HNTB top Building Design+Construction's 2013 ranking of the largest state government sector architecture and architecture/engineering firms in the U.S. 


By BD+C Staff | July 18, 2013
Rank Company 2012 State Government Revenue ($)
1 Stantec $65,067,691
2 Perkins+Will $27,947,950
3 HNTB Archtecture $19,760,606
4 IBI Group $19,527,117
5 DLR Group $16,500,000
6 HDR Architecture $13,834,330
7 Reynolds, Smith and Hills $10,900,000
8 HOK $9,874,000
9 NBBJ $6,464,000
10 SmithGroupJJR $5,700,000
11 EYP $5,000,000
12 Moseley Architects $4,216,535
13 EwingCole $4,000,000
14 RTKL Associates $2,722,000
15 SRG Partnership $2,709,290
16 Fentress Architects $2,514,423
17 Goodwyn, Mills & Cawood $2,380,000
18 Kaplan McLaughlin Diaz $2,311,834
19 Hoffmann Architects $2,090,000
20 HLW International $2,000,000
21 Ennead Architects $1,792,000
22 Heery International $1,784,965
23 CTA Architects Engineers $1,581,860
24 Cambridge Seven Associates $1,500,000
25 ZGF Architects $1,213,144
26 Flad Architects $1,180,000
27 Swanke Hayden Connell Asrchitects $1,000,000
28 SMMA | Symmes Maini & McKee Associates $990,000
29 CO Architects $965,000
30 Ware Malcomb $850,000
31 Astorino $792,000
32 KZF Design $782,174
33 Beyer Blinder Belle Architects & Planners $777,509
34 Perkins Eastman $750,000
35 Harley Ellis Devereaux $687,000
36 Integrated Design Group $523,579
37 Solomon Cordwell Buenz $500,000
38 Legat Architects $493,000
39 Gresham, Smith and Partners $348,561
40 Morris Architects $300,000
41 Rule Joy Trammell + Rubio $200,000
42 Emersion Design $125,697
43 OZ Architecture $125,480
44 LS3P $109,304
45 Hammel, Green and Abrahamson $76,000
46 Epstein $72,000
47 Sherlock, Smith & Adams $59,000
48 Fletcher-Thompson $50,000
49 PageSoutherlandPage $21,470

 

Back to Government Giants article

 

Read the full 2013 Giants 300 Report

Related Stories

| Apr 30, 2013

Tips for designing with fire rated glass - AIA/CES course

Kate Steel of Steel Consulting Services offers tips and advice for choosing the correct code-compliant glazing product for every fire-rated application. This BD+C University class is worth 1.0 AIA LU/HSW.

| Apr 2, 2013

6 lobby design tips

If you do hotels, schools, student unions, office buildings, performing arts centers, transportation facilities, or any structure with a lobby, here are six principles from healthcare lobby design that make for happier users—and more satisfied owners.

| Feb 22, 2013

Zaha Hadid to help plan new London-area airport hub

The Mayor of London has appointed Zaha Hadid Architects to help create a major new airport in southeastern England.

| Jan 31, 2013

More severe wind storms should prompt nationwide reexamination of building codes, says insurance expert

The increased number and severity of storms with high winds nationally should prompt a reexamination of building codes in every community, says Mory Katz, vice president, Verisk Insurance Solutions Commercial Property, Jersey City, N.J.

| Aug 28, 2012

McCarthy begins construction on transportation center at Bob Hope Airport

Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.

| Jun 14, 2012

Viscardi joins LEO A DALY as VP, corporate director of aviation programs

Viscardi will be responsible for providing the vision and strategy for growing the firm’s aviation practice, identifying and establishing new clients, as well as maintaining existing client relationships.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 30, 2012

Construction milestone reached for $1B expansion of San Diego International Airport

Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021