flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Populous and SRG Partnership selected to transform Oregon State University’s Reser Stadium

Sports and Recreational Facilities

Populous and SRG Partnership selected to transform Oregon State University’s Reser Stadium

Populous has recently release renderings of the project.


By David Malone, Associate Editor | March 26, 2021
Reser Stadium

All renderings courtesy Populous

Oregon State University’s Reser Stadium is set to undergo a transformation project to become a best-in-class football facility with year-round amenities accessible by all students, athletes, faculty, and staff. Populous, in collaboration with SRG Partnership and design-build partner Hoffman Construction, has recently released the first renderings of the project.

The west side of the stadium will be entirely redesigned to feature a 360-degree concourse that will encourage Beaver fans to discover new experiences. Dubbed Beaver Street, the new concourse will create a connection, both in the bowl and on the counter course, helping to unify the fan experience and bring the entire facility together physically. It will be a first-of-its-kind in collegiate sports facilities, flipping the traditional design of a football concourse and turning it inside out with all amenities arranged so fans have an open-air direct view of the field.

Concession areas were reimagined to have more of a storefront appearance and traditional walkup stands have been replaced with fast-casual dining and self-service grab-and-go stores. Food and beverage offerings have been overhauled to more closely reflect the OSU fanbase through familiar local restaurants and regional fare.

 

Reser Stadium student experience center at southwest elevation

 

Season ticket holders will have 1,600 chairback seats less than 80 feet from the field. The premium seating deck is 100 feet away from the sideline and will include loge boxes, living room boxes, club seats, and Founders Suite seats in one seating deck. All premium seating areas are covered and protected from the elements.

The lower level of the west side deck will house the new OSU Student Experience Center. The Center is vertically connected to the stadium’s club spaces, allowing the club to function as a multi-purpose event space for OSU and the greater Corvallis community.

 

Reser Stadium West Horizon

 

A 35,000-sf Wellness Clinic addition will be located on the southeast corner of the stadium. This four-story facility will provide whole-student care, including primary care, counseling, and x-ray and laboratory services. New locker room facilities for visiting teams and a new press box structure are also included in the design.

The project is slated for completion in the summer of 2023.

Related Stories

| Aug 11, 2010

Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report

A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average

The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Draft NIST report on Cowboys practice facility collapse released for public comment

A fabric-covered, steel frame practice facility owned by the National Football League’s Dallas Cowboys collapsed under wind loads significantly less than those required under applicable design standards, according to a report released today for public comment by the Commerce Department's National Institute of Standards and Technology (NIST).

| Aug 11, 2010

Recreation facility scores with sustainable features

A new $79.1 million health and learning center is under construction on the Northern Arizona University campus in Flagstaff. The 270,000-sf facility will house recreation space, classrooms, health and counseling services, and the Lumberjack Stadium for track and soccer teams. Designed by the Phoenix office of OWP/P Cannon Design with Mortenson Construction as CM, the project is aiming for LEED ...

| Aug 11, 2010

And the world's tallest building is…

At more than 2,600 feet high, the Burj Dubai (right) can still lay claim to the title of world's tallest building—although like all other super-tall buildings, its exact height will have to be recalculated now that the Council on Tall Buildings and Urban Habitat (CTBUH) announced a change to its height criteria.

| Aug 11, 2010

TCF Bank Stadium first new football stadium to get LEED certification

The University of Minnesota has received LEED Silver certification for its 50,805-seat TCF Bank Stadium, making it the first new football stadium in the country to achieve LEED status. Designed by Populous, Kansas City, Mo., the facility features a stormwater management system that captures and stores rainwater in an underground filtering system, where it is harvested, filtered, and drained int...

| Aug 11, 2010

Construction begins on Louisiana State Sports Hall of Fame

Heavy construction and foundation work has started on the new Louisiana State Sports Hall of Fame and Regional History Museum in Natchitoches, La. Designed by Trahan Architects, Baton Rouge, the $12 million, 28,000-sf museum will be clad in sinker cypress planks as a nod to the region’s rich timber legacy and to help control light, views, and ventilation throughout the facility.

| Aug 11, 2010

Modest recession for education construction

Construction spending for education expanded modestly but steadily through March, while at the same time growth for other institutional construction had stalled earlier in 2009. Education spending is now at or near the peak for this building cycle. The value of education starts is off 9% year-to-date compared to 2008.

| Aug 11, 2010

Great Solutions: Green Building

27. Next-Generation Green Roofs Sprout up in New York New York is not particularly known for its green roofs, but two recent projects may put the Big Apple on the map. In spring 2010, the Lincoln Center for the Performing Arts will debut one of the nation's first fully walkable green roofs. Located across from the Juilliard School in Lincoln Center's North Plaza, Illumination Lawn will consist ...

boombox1 - default
boombox2 -
native1 -

More In Category


Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021