flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

JFK Airport set for $10 billion renovation

Airports

JFK Airport set for $10 billion renovation

In addition to the airport itself, the overhaul will also improve road and rail access to meet projected passenger growth.


By David Malone, Associate Editor | January 17, 2017

Image courtesy of Office of the Governor of New York

Plans to improve JFK International Airport and the surrounding roads and rail system were recently announced by Gov. Cuomo. And these plans don’t just call for fixing some drywall or filling a pothole here and there, either, they seek to completely transform and update the international transportation hub.

This transformation is projected to cost about $10 billion. $7 billion of that total will be coming from airlines that operate there, such as Delta and American, while $1 billion will be provided by the Port Authority of New York and New Jersey. $1.5 billion to $2 billion of state funding will also be provided exclusively for work on the surrounding roads, which will begin immediately, according to CNN Money.

The airport will see some of its newer terminals expanded while older terminals are redeveloped and relocated. According to designboom.com, on-airport roadways will be redesigned into a ring road configuration for better vehicular access and parking lots will become more centralized and larger, offering both short-term and long-term parking options.

Beyond just expanding the terminals and making the airport as a whole more navigable, a focus on improving the airport’s amenities is also a key component of the overall plan. Fine dining options, duty-free shops, and conference and meeting room facilities will be added. Safety features will also be improved with the addition of facial recognition technology and video tracking software.

JFK Airport served 60 million passengers in 2016 and that number is only set to grow. With its current setup, JFK will reach its passenger capacity by the mid 2020’s. By 2050, the airport is expected to serve 100 million passengers a year, but there has not yet been a timeframe announced for the expansion and renovation project nor has it been determined what the new passenger capacity of the renovated airport will be.

 

Image courtesy of Office of the Governor of New York.

 

Image courtesy of Office of the Governor of New York.

 

Image courtesy of Office of the Governor of New York.

Tags

Related Stories

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 15, 2013

Metal makes its mark on interior spaces

Beyond its long-standing role as a preferred material for a building’s structure and roof, metal is making its mark on interior spaces as well. 

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Sep 30, 2013

Smart building systems key to new Wisconsin general aviation terminal’s net zero target

The Outagamie County Regional Airport’s new 8,000 sf general aviation terminal was designed to achieve net zero.

| Sep 19, 2013

What we can learn from the world’s greenest buildings

Renowned green building author, Jerry Yudelson, offers five valuable lessons for designers, contractors, and building owners, based on a study of 55 high-performance projects from around the world.

| Sep 19, 2013

6 emerging energy-management glazing technologies

Phase-change materials, electrochromic glass, and building-integrated PVs are among the breakthrough glazing technologies that are taking energy performance to a new level. 

| Sep 11, 2013

BUILDINGChicago eShow Daily – Day 3 coverage

Day 3 coverage of the BUILDINGChicago/Greening the Heartland conference and expo, taking place this week at the Holiday Inn Chicago Mart Plaza.

| Sep 10, 2013

BUILDINGChicago eShow Daily – Day 2 coverage

The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021