Plans to improve JFK International Airport and the surrounding roads and rail system were recently announced by Gov. Cuomo. And these plans don’t just call for fixing some drywall or filling a pothole here and there, either, they seek to completely transform and update the international transportation hub.
This transformation is projected to cost about $10 billion. $7 billion of that total will be coming from airlines that operate there, such as Delta and American, while $1 billion will be provided by the Port Authority of New York and New Jersey. $1.5 billion to $2 billion of state funding will also be provided exclusively for work on the surrounding roads, which will begin immediately, according to CNN Money.
The airport will see some of its newer terminals expanded while older terminals are redeveloped and relocated. According to designboom.com, on-airport roadways will be redesigned into a ring road configuration for better vehicular access and parking lots will become more centralized and larger, offering both short-term and long-term parking options.
Beyond just expanding the terminals and making the airport as a whole more navigable, a focus on improving the airport’s amenities is also a key component of the overall plan. Fine dining options, duty-free shops, and conference and meeting room facilities will be added. Safety features will also be improved with the addition of facial recognition technology and video tracking software.
JFK Airport served 60 million passengers in 2016 and that number is only set to grow. With its current setup, JFK will reach its passenger capacity by the mid 2020’s. By 2050, the airport is expected to serve 100 million passengers a year, but there has not yet been a timeframe announced for the expansion and renovation project nor has it been determined what the new passenger capacity of the renovated airport will be.
Image courtesy of Office of the Governor of New York.
Image courtesy of Office of the Governor of New York.
Image courtesy of Office of the Governor of New York.
Related Stories
| May 11, 2014
Final call for entries: 2014 Giants 300 survey
BD+C's 2014 Giants 300 survey forms are due Wednesday, May 21. Survey results will be published in our July 2014 issue. The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue.
| Apr 29, 2014
USGBC launches real-time green building data dashboard
The online data visualization resource highlights green building data for each state and Washington, D.C.
| Apr 22, 2014
Bright and bustling: Grimshaw reveals plans for the Istanbul Grand Airport [slideshow]
In partnership with the Nordic Office of Architecture and Haptic Architects, Grimshaw Architects has revealed its plans for the terminal of what will be one of the world's busiest airports. The terminal is expected to serve 150 million passengers per year.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.
| Mar 12, 2014
14 new ideas for doors and door hardware
From a high-tech classroom lockdown system to an impact-resistant wide-stile door line, BD+C editors present a collection of door and door hardware innovations.
| Mar 5, 2014
5 tile design trends for 2014
Beveled, geometric, and high-tech patterns are among the hot ceramic tile trends, say tile design experts.