flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Doug Woods, DPR Construction's cofounder, dead at 70

Contractors

Doug Woods, DPR Construction's cofounder, dead at 70

His management style stressed collaboration that can tackle complex projects.


By John Caulfield, Senior Editor | May 25, 2021
Doug Woods (center), in a 2015 photo with DPR Construction cofounders Ron Davidowski (left) and Peter Nosler. Their business is one of the industry's leading general contractors. Images: DPR

Doug Woods (center), in a 2015 photo with DPR Construction cofounders Ron Davidowski (left) and Peter Nosler. Their business is one of the industry's leading general contractors. Images: DPR

   

Doug Woods, cofounder of Redwood City, Calif.-based DPR Construction, passed away peacefully at his home on May 19, according to a statement released by the company. He was 70 years old.

The cause of death and the names of family survivors were not immediately available.

With partners Peter Nosler and Ron Davidowski, and $750,000 in pooled resources, Woods launched DPR as a self-performing general contractor in Palo Alto, Calif., in 1990. (The firm’s name derives from the initials of the founders’ first names.) “When we started DPR, we wanted to be a customer-focused organization,” recalls Woods, who always saw DPR as a service business. “We’re not a hard-bid general contractor; we’re a negotiating, self-performing general contractor that takes care of our customers. To do that, we need great people, who are happy and willing to work hard. That’s one of the things that started us, making us different from the very beginning.”

By 1995, DPR ranked third on Inc. Magazine’s national fastest-growing private companies listing. And over more than 30 years, Woods, Nosler and Davidowski watched their business expand into one of the industry’s largest GCs, with roughly 6,500 office and craft employees worldwide and more than $6 billion in revenue in 2019, the latest year for which sales information was available.

Woods stepped back from day-to-day management of the firm in 2015, but stayed on DPR’s Management Committee until 2017. He served as CEO on the firm’s board of directors until his passing.

CONSTRUCTION IN HIS BLOOD

Doug Woods, cofounder, DPR Construction

DPR Construction's Doug Woods emphasized team building and customer service.

 

Born in Ontario on January 27, 1951, Woods was the son of an engineer. His family built or remodeled every house that Woods lived in growing up, and his father worked in construction and real estate. “Being in the construction field is in my blood,” Woods was quoted as saying.

DPR’s first ground-up project was a skilled-nursing facility for The Terraces in Los Gatos, Calif., and healthcare has since been one of its primary practices. The firm hit $1 billion in annual revenue for the first time in 1998. But Woods wasn’t interested so much in milestones. “For us, there has been no single defining moment but a series of opportunities and challenges that have impacted the company DPR is today and made us stronger.

The company’s unregimented management style—“No titles, no ties, no org chart,” Woods told the San Francisco Business Times in 2015—found its success in collaborative teamwork, which is palpable in the reminiscences of several colleagues and employees.

TEAM BUILDING MORE WORDS

“I only had the privilege of meeting Doug maybe six times. From a guy who came up from the field and had limited education, Doug really showed me what ‘no rank in the room’ meant: ‘Don’t ever forget, we exist to build great things,’ ” recalled Robbie Thomason, a senior superintendent who has been with DPR for more than seven years.

David Ibarra, a 25-year company vet who directs the firm’s mission-critical group, remembers meeting Woods as a new employee doing electrical on a complex project. Woods wanted to know if Ibarria was getting the management support he needed in the field to execute his job. “If not, he told me ‘just call them out.’ I had a founder talking to me directly, and ensuring that I was empowered to do my role.”

Kurt Wallner, a Project Executive at DPR, first encountered Woods in May 2000, when the latter was laying out the firm’s 2030 Mission. “Hearing Doug talk about a vision for DPR, decades into the future, I knew right then that I was joining something very, very special.”

Woods served on the Construction Industry Roundtable and was a board member with U.S. Green Building Council. And his legacy at DPR could, in part, be defined by Mission 2030, the firm’s strategic focus to be recognized as one of the world’s most admired companies by that year.

Related Stories

| May 14, 2012

Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons

Supertall two-tower complex located in Seoul’s Yongsan International Business District.

| May 14, 2012

SMPS and Deltek announce alliance

A/E/C industry leaders partner to advance technology’s role in design firm marketing and business development.

| May 14, 2012

ArchiCAD e-Specs integration unveiled

Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.

| May 11, 2012

2012 White Paper: High-Performance Reconstructed Buildings: The 99% Solution

Download the complete White Paper, Chapters 1-10

| May 11, 2012

Chapter 10 Action Plan: 18 Recommendations for Advancing Sustainability in Reconstructed Buildings

We offer the following recommendations in the hope that they will help step up the pace of high-performance building reconstruction in the U.S. and Canada. We consulted many experts for advice, but these recommendations are solely the responsibility of the editors of Building Design+Construction. We welcome your comments. Please send them to Robert Cassidy, Editorial Director: rcassidy@sgcmail.com.

| May 11, 2012

Chapter 9 The Key to Commissioning That Works? It Never Stops

Why commissioning for existing and renovated buildings needs to be continuous to be effective.

| May 11, 2012

Chapter 8 High-Performance Reconstruction and Historic Preservation: Conflict and Opportunity

What historic preservationists and energy-performance advocates can learn from each other.

| May 11, 2012

VFA to acquire Altus Group's Capital Planning division

Strategic move strengthens VFA's facilities capital planning market osition in North America.

| May 11, 2012

Betz promoted to senior vice president for McCarthy’s San Diego Office

He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.

| May 11, 2012

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 


MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021