flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Deflection Bead case history: The Confluence

Sponsored Content Walls and Partitions

Deflection Bead case history: The Confluence

In multi-level buildings, the upper floors exert force upon the lower floors and can cause cracking of the drywall where the lower floor wall meets the ceiling, especially when the upper floors are subject to variable load, impact, or other unexpected forces.


By Trim-Tex | June 12, 2017

A rendering of the proposed apartment tower at 2166 15th St., Denver. Gromatzky Dupree and Associates (GDA Architects).

GDA Architects designed the $90 million Confluence building at Riverfront Park in Denver, Colorado as a modern 34-story tower. With 288 luxury multifamily apartments, the Confluence was designed to be the tallest building in Riverfront Park, requiring a solution for a common problem in multi-level buildings: interior finishing deflection cracks.

In multi-level buildings, the upper floors exert force upon the lower floors and can cause cracking of the drywall where the lower floor wall meets the ceiling, especially when the upper floors are subject to variable load, impact, or other unexpected forces. These cracks are unattractive and a frequent motivation for repair calls in buildings where they occur.

In designing The Confluence, GDA Architects had to resolve the possible deflection of the floors to ensure the integrity of the drywall below. They chose Trim-Tex Deflection Bead to absorb these forces and ensure a superior drywall finish. Deflection bead not only eliminates cracks, but also leaves a clean shadow line finish at the head of the wall.

 

(Left) Inside corner cracking. (Right) Blistering inside corner due to deflection.

 

Wall-Mounted Deflection Bead features a co-extruded flexible gasket that compresses and expands during architectural deflection to provide protection for as much as 7/16” of deflection. Deflection Bead also features a tear-off strip that acts as a masking guide to protect the concrete finish from mud. The strip is then easily removed during final sanding, leaving the wall with a clean, finished edge.

Trim-Tex Deflection Bead is permitted in both fire-rated and non-fire- rated assemblies. GDA paired it with Hilti’s Firestop Top Track Seal to achieve a wall that is fire-rated as well as cleanly finished and free of cracks. The combined system fills in the gap between metal tracks and imperfect concrete, as well as prevents smoke, air, and sound transfer.

Additionally, GDA Architects’ inclusion of Trim-Tex Deflection Bead offers peace of mind to the building’s owner, who will have lower building maintenance costs, and happier residents enjoying their beautiful, modern home.

For more information on Trim-Tex Deflection Bead visit www.trim-tex.com.

Related Stories

| Jul 13, 2012

July 2012: Products at Work

Panel wall system, folding windows, rubber flooring, wire mesh railings.

| Jun 8, 2012

Allsteel names Kris Yates to head architectural products group

Yates is responsible for the start up, launch and ongoing sales and marketing of Allsteel’s new Beyond movable walls.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| May 31, 2012

Product Solutions June 2012

Curing agents; commercial faucets; wall-cladding systems.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| Apr 4, 2012

Educational facilities see long-term benefits of fiber cement cladding

Illumination panels made for a trouble-free, quick installation at a cost-effective price.

| Dec 7, 2011

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021