flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Wiseburn High School: New kind of P3

Reconstruction Awards

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.


By John Caulfield, Senior Editor | November 20, 2018
Wiseburn High School atrium

An atrium showcases the stacking of student collaboration spaces for each charter school within the building. The ground floor is used as shared space for performing arts, team sports, and other programming. A curvilinear grand stair winds its way up the building. Each charter school has its own “address” off of the staircase. © 2018 Gensler/Ryan Gobuty

The adaptive reuse of a 330,000-sf, four-story Northrup Grumman engineering office building in El Segundo, Calif., has yielded three independent charter schools with 72 classrooms that serve 1,350 students.

This was the largest conversion of commercial space to school building to make it through Division of the State Architect’s approval process.   

Wiseburn School District, which had been a K-8 entity since 1896, became a unified K-12 district in 2014. Having already acquired the Northrup Grumman site, the USD partnered with Da Vinci Charter Schools—where 80% of the district’s eighth graders had been enrolled—to build a nontraditional high school whose learning environments would reflect the professional world.

Last November, three charter schools began classes at the new Wiseburn High School: Da Vinci Science, which includes an engineering lab; Da Vinci Communications; and Da Vinci Design, which has a fabrication lab.

To meet the DSA’s retrofit and fire-rating mandate within a construction budget under $300/sf, the project team demolished 90,000 sf of existing space; reused the building’s steel framing, central plant, and select infrastructural components; and used off-the-shelf systems, materials, and finishes.   

Each level has a flexible 52,000-sf floorplate with floor-to-ceiling windows designed for natural light. Classrooms are organized around unprogrammed common areas that double as circulation and breakout spaces. Classrooms have rearrangeable desks; each has a science lab.

A central atrium reveals a stacking of student collaboration spaces. There are no corridors or lockers; many of the walls are movable. Each school has a retractable door that rolls up onto an outdoor patio. Each school also has its own “address” off of a grand staircase that connects the teaching areas.

 

Wiseburn High School Stair© 2018 Gensler/Ryan Gobuty.

 

Silver Award Winner

BUILDING TEAM Gensler (submitting firm, architect) Saiful-Bouquet Structural Engineers (SE) KPFF Consulting Engineers (CE) tk1sc (MEP) Pamela Burton & Co. (landscape) New Vista Design (planning consultant) Balfour Beatty Construction Services (GC) DETAILS 220,000 sf Total cost $60 million Construction time January 2013 to November 2017 Delivery method CM at risk

 

CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE

Related Stories

Reconstruction Awards | Jan 6, 2021

University of Pennsylvania’s Stemmler Hall forgoes retrofit in favor of complete renovation

The Edward J. Stemmler Hall project has won a Bronze Award in BD+C’s 2020 Reconstruction Awards.

Reconstruction Awards | Dec 29, 2020

The reenvisioned Sazerac House: A delectable cocktail that's just perfect for the Big Easy

The 51,987-sf Sazerac House is an interactive cocktail museum, active distillery, corporate headquarters, and event venue, all under one roof, next to the historic French Quarter of New Orleans.

Reconstruction Awards | Dec 18, 2020

Can converting a landmark office to a clinic raise up a downtrodden Philadelphia neighborhood?

BD+C’s Reconstruction Awards recognize the adaptive reuse of the Kensington Trust building.

Reconstruction Awards | Dec 18, 2020

Spokane Riverfront Park U.S. Pavilion project creates a refreshed gathering place in Spokane

The project has won a Bronze Award in BD+C's 2020 Reconstruction Awards.

Reconstruction Awards | Dec 16, 2020

Voters resuscitate an abandoned high school in northern California

A 2014 bond issue provided financing to seismically stabilize and modernize Historic Alameda High School, a 2020 Silver Reconstruction Award winner.

Reconstruction Awards | Dec 14, 2020

Wyoming Capitol Square renovation project is all about the details

The Wyoming Capitol Square project has won a Gold Award in BD+C's 2020 Reconstruction Awards.

Reconstruction Awards | Dec 12, 2020

A famed dome of a historic glasshouse is revived to its rightful glory

Scaffolding played a critical role in the repair and restoration of the Enid A. Haupt Conservatory’s Palm Dome at the New York Botanical Gardens, a Gold winner of BD&C’s 2020 Reconstruction Awards

Reconstruction Awards | Dec 8, 2020

A synagogue in Toronto is renewed while preserving its history

Holy Blossom Temple is a Platinum winner in BD+C’s 2020 Reconstruction Awards.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021