flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Wiseburn High School: New kind of P3

Reconstruction Awards

Wiseburn High School: New kind of P3

A California school district and a charter school system join forces to open a skills-based high school.


By John Caulfield, Senior Editor | November 20, 2018
Wiseburn High School atrium

An atrium showcases the stacking of student collaboration spaces for each charter school within the building. The ground floor is used as shared space for performing arts, team sports, and other programming. A curvilinear grand stair winds its way up the building. Each charter school has its own “address” off of the staircase. © 2018 Gensler/Ryan Gobuty

The adaptive reuse of a 330,000-sf, four-story Northrup Grumman engineering office building in El Segundo, Calif., has yielded three independent charter schools with 72 classrooms that serve 1,350 students.

This was the largest conversion of commercial space to school building to make it through Division of the State Architect’s approval process.   

Wiseburn School District, which had been a K-8 entity since 1896, became a unified K-12 district in 2014. Having already acquired the Northrup Grumman site, the USD partnered with Da Vinci Charter Schools—where 80% of the district’s eighth graders had been enrolled—to build a nontraditional high school whose learning environments would reflect the professional world.

Last November, three charter schools began classes at the new Wiseburn High School: Da Vinci Science, which includes an engineering lab; Da Vinci Communications; and Da Vinci Design, which has a fabrication lab.

To meet the DSA’s retrofit and fire-rating mandate within a construction budget under $300/sf, the project team demolished 90,000 sf of existing space; reused the building’s steel framing, central plant, and select infrastructural components; and used off-the-shelf systems, materials, and finishes.   

Each level has a flexible 52,000-sf floorplate with floor-to-ceiling windows designed for natural light. Classrooms are organized around unprogrammed common areas that double as circulation and breakout spaces. Classrooms have rearrangeable desks; each has a science lab.

A central atrium reveals a stacking of student collaboration spaces. There are no corridors or lockers; many of the walls are movable. Each school has a retractable door that rolls up onto an outdoor patio. Each school also has its own “address” off of a grand staircase that connects the teaching areas.

 

Wiseburn High School Stair© 2018 Gensler/Ryan Gobuty.

 

Silver Award Winner

BUILDING TEAM Gensler (submitting firm, architect) Saiful-Bouquet Structural Engineers (SE) KPFF Consulting Engineers (CE) tk1sc (MEP) Pamela Burton & Co. (landscape) New Vista Design (planning consultant) Balfour Beatty Construction Services (GC) DETAILS 220,000 sf Total cost $60 million Construction time January 2013 to November 2017 Delivery method CM at risk

 

CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE

Related Stories

Reconstruction Awards | Dec 1, 2017

Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub

In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.

Reconstruction Awards | Dec 1, 2017

Gothic revival: The nation’s first residential college is meticulously restored

This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.

Reconstruction Awards | Dec 1, 2017

Rockefeller remake: Iconic New York tower is modernized for its next life

To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.

Reconstruction Awards | Nov 30, 2017

BD+C's 2017 Reconstruction Award Winners

Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.

Reconstruction Awards | Nov 29, 2017

College credit: Historic rehab saves 50% on energy costs

The project team conducted surveys of students, faculty, and staff to get their input.

Reconstruction Awards | Nov 29, 2017

Amazing grace: Renovation turns a church into elegant condos

The windows became The Sanctuary’s chief sales edge.

Reconstruction Awards | Nov 28, 2017

Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan

The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.

Reconstruction Awards | Nov 27, 2017

Higher education: The rebirth of a Washington, D.C., high school

The project team, led by architect Perkins Eastman, restored the original cupola.

Reconstruction Awards | Nov 27, 2017

Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer

The project team had to fix poor renovations made in the ’50s.

Reconstruction Awards | Nov 27, 2017

Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds

Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021