This week on The Weekly show, BD+C editors spoke with leaders from ALICE Technologies, Build Group, Hastings Architecture, Nvidia, and Woods Bagot about three themes:
• How to improve wayfinding and signage to meet the needs of a pandemic environment
• Applications for the use of artificial intelligence (AI) in construction scheduling
• Omniverse, Nvidia's new 3D simulation platform
WATCH THE SEGMENTS ON DEMAND BELOW
THE WEEKLY SHOW HIGHLIGHTS FOR NOVEMBER 12, 2020
BD+C's Group Director Tony Mancini runs down the highlights from this week's show.
SEGMENT #1
COVID-19 Signage Design and Wayfinding
BD+C's Robert Cassidy chats with David Bailey, AIA, Principal with Hastings Architecture, Nashville, Tenn., about improved signage and wayfinding for the COVID-19 pandemic. Bailey will show examples of bad signage that has sprung up, and how Hastings Architecture has designed new signs that use graphics and text to provide better information and clearer direction to the public.
SEGMENT #2
AI for Construction Scheduling
BD+C's David Barista speaks with Rene Morkos, PhD, Founder of ALICE Technologies, and Mike MacBean, Director of Preconstruction with San Francisco-based GC Build Group, about applications for the use of artificial intelligence (AI) tools for optimizing the construction scheduling process. Build Group is piloting the ALICE platform on the 5M mega project in San Francisco.
SEGMENT #3
Omniverse: A Collaborative Platform to Simulate Reality
John Caulfield speaks with Richard Kerris, GM of Media and Entertainment for Nvidia, and Robert Cervellione, Design Technology Manager with Woods Bagot, about Omniverse, Nvidia's 3D simulation platform that allows users to collaborate with multiple pieces of software.
WATCH ‘THE WEEKLY’ EVERY THURSDAY AT 1 PM EASTERN
“The Weekly” is a presentation of Horizon TV, the online broadcast arm of SGC Horizon LLC, publishers of Building Design+Construction, Multifamily Design+Construction, Professional Builder, ProRemodeler, and Construction Equipment.
Related Stories
AEC Tech | Apr 12, 2019
NBBJ creates Design Performance Group whose goal is to connect building design with occupant wellbeing
The firm also wants to advance energy efficiency in its projects.
AEC Tech | Apr 10, 2019
Speaker Update! Accelerate AEC Innovation Conference, May 13-14, NYC
BD+C's third-annual Accelerate AEC Innovation Conference (May 13-14, NYC) will explore AI in architecture, offsite construction, smart buildings, AEC business innovations, big data in construction, and much more.
AEC Tech | Mar 26, 2019
Embracing collaboration tools from outside the AEC industry
Let's take a look at the available technologies from outside AEC that are seeing greater adoption within the industry.
AEC Tech | Mar 24, 2019
5 ways designers and builders can use business intelligence with data they already have
Tricky construction budgets, large project teams, and unique designs needing extensive coordination are all problems increasingly being handled with new software tools and data.
AEC Tech | Feb 8, 2019
BI(m): BIM data without models
A new breed of data tools creates a valuable opportunity for the next wave of BIM and facilities management, one where “pure data” is at the center, writes John Tobin of SMRT Architects.
AEC Tech | Jan 9, 2019
Our robotic future: Assessing AI's impact on the AEC profession and the built environment
This is the first in a series by Lance Hosey, FAIA, on how automation is disrupting design and construction.
3D Printing | Dec 7, 2018
Additive manufacturing heads to the jobsite
Prototype mobile 3D printing shop aims to identify additive manufacturing applications for construction jobsites.
AEC Tech | Sep 27, 2018
BD+C editors want your input on AEC technology
Please help us improve our editorial coverage by taking this brief survey.
Sponsored | AEC Tech | Sep 14, 2018
Sponsored webinar: Benefits of traceable construction
In this free 60-minute webinar, Keith Alcorn of FARO Technologies will talk about the concept of traceable construction and how 3D reality capture solutions provide portable, efficient, secure, and forward-looking solutions for data collection, pre-processing, and evaluation in the design, build and operating phase. September 18, 2:00 EST.
AEC Tech | Jul 24, 2018
Weidt Group’s Net Energy Optimizer now available as software as a service
The proprietary energy analysis tool is open for use by the public.