Wakarusa Township fire station meets innovation

Sponsored Content Metals

Wakarusa Township fire station meets innovation


By STAR BUILDING SYSTEMS | September 23, 2020

With a population just over 2000 – the largest portion of them retirees – Wakarusa Township is a quiet, unassuming spot in eastern Kansas occupying about 46 square miles of rolling midwestern terrain. Recently, however, there was quite a bit of excitement happening on 31st Street, as the Wakarusa Township Fire Department got a new station with all the bells, whistles and, of course, sirens.

The Wakarusa Township Fire Department relies primarily on volunteers to serve the township along with EMS services to assist with medical emergencies in the surrounding areas within Douglas County. So, when the time arrived to replace fire station #1’s existing building with a new, more modern facility, one of the department’s board members contacted Art Kuehler with the local construction firm HASTCO, Inc., and set the plan in motion.

 

 

Kuehler worked in partnership with Lawrence, Kansas-based architectural firm Hernly Associates and together, they created a vision for the new, nearly 14,500-square-foot station: a slate gray custom engineered metal building design featuring a Double-Lok roof system and AVP wall panels from Star Building Systems. A metal building is an ideal choice for a fire station, according to Kuehler, because of the generous height and clean span widths.

 

 

Construction of the building was not without its challenges… When the team discovered the lot had a significant slope, their first consideration was to build one side of the building pad up more than 6 feet. However, when they realized that was the same side of the building on which the fire trucks would need to enter the apparatus bays, they shifted their thinking and created an innovative new plan. Instead of filling the lot, according to Art, the team “buried the back of the building in the ground with a five-foot concrete retaining wall”.

 

 

HASTCO and Hernly contracted Big Johnson Construction, located in Fort Morgan, Colorado, for the erection of the building. The team chose Star’s 24-gauge Double-Lok Galvalume Plus with R-32 Optiliner insulation for the roof panels and 26-gauge AVP with R-32 Opti-Liner insulation for the wall panels.

 

 

Today, the crew at station #1 enjoys a spacious main floor with offices, bunk rooms, a conference room, bathrooms and showers, a dayroom with kitchen and dining, a radio/report room, and nine apparatus bays to house trucks and equipment. A second floor over the office and dayroom will eventually include a classroom, storage, mechanical room, and restrooms. For a creative twist, the team added a set of switchback stairs on the front of the building, then built around them to give the appearance of a tower on the front of the building.

At Star, one of our favorite parts of the job is helping our customers accomplish their design and building challenges. We love seeing innovative concepts like the Wakarusa Fire Station come to life and look forward to helping you dream up – and build – your next big idea!

 

Tags

Related Stories

Sponsored | Coatings | Aug 16, 2017

Architectural details offer endless inspiration

Railings, screens, canopies, and shading devices punctuate projects and are important aspects of the built environment.

Sponsored | Roofing | Jun 29, 2017

Metal roofs are soaring in popularity in the residential market

The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.

Sponsored | Metals | Jun 15, 2017

Inside-out cheese-making: 12,000-sf metal building features an unusual exoskeleton design

In order to maintain hygienic cleanliness inside the facility, smooth, continuous wall surfaces with a minimum number of joints, indents or protrusions is desirable.

| Jun 13, 2017

Accelerate Live! talk: Driving value through process innovation, Jonathan O'Leary, NCI Building Systems (sponsored)

NCI Building Systems’ Jonathan O'Leary discusses why AEC firms must rely on their partners to simplify the business process and minimize risk.

Sponsored | Roofing | May 24, 2017

Duro-Last Duro-Bond Roofing System installed on New England warehouse

Breault Roofing created a way to make the installation process more efficient by requesting mostly tabless sheets and fastening the membrane with induction welding to the purlins instead of a regular mechanically fastened system onto the pan.

Sponsored | Metals | May 22, 2017

Tapered columns can slim down costs

In many metal building applications, straight columns may have more steel than they need.

Sponsored | Coatings | May 5, 2017

Butler Tech Bioscience Center features hands-on learning in bold new building

Butler Tech students can now study and work in neighboring buildings that feature ALPOLIC metal panels coated in Valspar’s Valflon®. 

Sponsored | Metals | May 3, 2017

Steel protection methods

There are robust, well-proven ways to protect steel so it can perform up to its potential virtually indefinitely.

Sponsored | Metals | Apr 28, 2017

Colorful corrugated wall panels provide bright new look for community library

Approximately 2,600 sq. ft. of PAC-CLAD 7/8” Corrugated Panels in five different colors was just what the design team was looking for.

Sponsored | Coatings | Apr 27, 2017

Community center makes a statement in West Sacramento

It takes a team to find the perfect color combination, and this time we accomplished it with the help of CENTRIA.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021