flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Owens Corning® FOAMULAR® XPS solution brings game-changing solution to Mercedes-Benz Stadium

Sponsored Content Roofing

Owens Corning® FOAMULAR® XPS solution brings game-changing solution to Mercedes-Benz Stadium

Bill Johnson, design principal for HOK, brought together experts from across the country to help realize the revolutionary engineering, design, and functionality envisioned for the $1.5 billion Mercedes-Benz Stadium project.


By Owens Corning | August 17, 2018

The Mercedes-Benz Stadium in Atlanta opened in August of 2017 to great fanfare. Driven by Arthur Blank’s vision to “build a venue that would not only exceed expectations, but also push the limits of what was possible in terms of stadium design, fan experience and sustainability,” the new stadium truly changed the game for sports stadiums.   

Bill Johnson, design principal for HOK, brought together experts from across the country to help realize the revolutionary engineering, design, and functionality envisioned for the $1.5 billion Mercedes-Benz Stadium project. The integrated team used a “top down” approach – literally – by envisioning the roof as the central design piece that would inform other elements to deliver a cohesive finished result.

Owens Corning experts joined Tennessee-based Porter Roofing contractors and Atlanta-based Larimer/Shannon Group to consult throughout the design and installation phases of the retractable roof.  The collaboration led to the use of the Owens Corning® FOAMULAR® 1000 high-strength extruded polystyrene (XPS) insulation to support Johnson’s state-of-the-art roof design.

 

 

Open and Closed Case for a Groundbreaking Roof

Inspired by the Pantheon in Rome with a circular opening in the domed roof, Johnson set out to challenge conventional retractable roof design by marrying physics, design and product solutions that delivered.  A key design challenge quickly became the sheer weight involved with the design of the petal-like pieces intended to open and close similar to a camera lens.

Designed for use in engineered applications requiring additional load-bearing capability,    Owens Corning® FOAMULAR® 1000 was selected as the insulation for the roof design. Proven to help resist damage from heavy loads with 100 psi compressive strengths, the unique closed-cell structure of FOAMULAR® XPS also helps to make it highly durable and resistant to moisture, retaining its excellent R-value even following prolonged exposure to moisture and freeze/thaw cycling.

After a series of models and tests working through the physics and weigh considerations, the team moved forward with the intricate and complex retractable roof design featuring eight triangular translucent panels creating the illusion of extended bird's wings when open. To achieve this automated movement, each segment would move alongside each other, sliding on its own linear track.

To accomplish this, the team immediately was faced with calibrating precise measurements that would accommodate the three different sized mechanized petals required to converge seamlessly in the oval opening. The Owens Corning team worked hand in hand with Porter Roofing to specialty cut FOAMULAR® XPS in tapered sizes supporting each of the petals.

The attention to detail on the state-of-the-art roof was time consuming.  So, while it was the first design element addressed – it was the last to get finalized.  When the LEED platinum certified stadium opened in 2017, the retractable roof system still required some additional fine-tuning.

The final construction phase of the roof was completed in July 2018 when it successfully opened and closed from the touch of a button in less than 12 minutes.  Due to its impressive stats, the finished Mercedes-Benz Stadium has been hailed as revolutionary in its design, engineering, functionality, sustainability, technology, and fan-friendliness.

For more information on the Owens Corning® FOAMULAR® 1000 solution featured in the  Mercedes-Benz Stadium, please visit https://www.owenscorning.com/insulation/commercial or call 1-800-GET-PINK®.

Tags

Related Stories

Building Materials | Feb 19, 2015

Prices for construction materials fall in January, following plummet of oil prices

The decline in oil and petroleum prices finally showed up in the produce price index data, according to ABC Chief Economist Anirban Basu.

Sponsored | Energy Efficient Roofing | Feb 12, 2015

How does airflow under a metal roof further enhance energy savings?

Metal roof coatings with solar reflectance can help building owners save substantially in annual cooling costs. Research has confirmed that creating an air space under a metal roofing system will increase energy savings during both summer and winter months. 

Sponsored | Roofing | Feb 11, 2015

New school blends with local architecture using Petersen metal roof

Perkins Eastman in Stamford, Conn., designed the school to emphasize and integrate the International Baccalaureate curriculum throughout.

Sponsored | Roofing | Jan 26, 2015

A revitalized solar roof for San Francisco's Davies Symphony Hall

White thermoplastic PVC roof system fits the bill for rooftop solar installation project at famed concert hall.

| Nov 17, 2014

Resolving practical problems in roofing retrofits and renovations [AIA course]

This course, worth 1.0 AIA HSW learning unit, provides expert advice on how to make a roof last as long as possible, and how to properly retrofit or reroof when the roof has run its course.

Sponsored | | Sep 2, 2014

Metal roofs offer energy-efficiency, durability, and recyclability

Metal roofing material is known for its durability, but it also offers two other sustainable attributes that are sometimes overlooked: enhanced energy-efficiency and high recyclability.

| Mar 20, 2014

Fluor defines the future 7D deliverable without losing sight of real results today

A fascinating client story by Fluor SVP Robert Prieto reminds us that sometimes it’s the simplest details that can bring about real results today—and we shouldn’t overlook them, even as we push to change the future state of project facilitation. 

| Dec 10, 2013

16 great solutions for architects, engineers, and contractors

From a crowd-funded smart shovel to a why-didn’t-someone-do-this-sooner scheme for managing traffic in public restrooms, these ideas are noteworthy for creative problem-solving. Here are some of the most intriguing innovations the BD+C community has brought to our attention this year.

| Nov 25, 2013

Manufacturers race to offer EPDs, HPDs in response to LEED v4

Under LEED v4, projects are awarded points for using at least 20 building products that have issued Environmental Product Declarations or Health Product Declarations. In response, manufacturers are racing to offer EPDs and HPDs for their product lines. 

| Oct 30, 2013

Metal roof design tips: The devil is in the details

This AIA/CES-approved presentation provides information regarding proper design to prevent possible infiltration from the roof system into the building. It also works as a guide when designing a roof to allow for proper water runoff.

boombox1 - default
boombox2 -
native1 -

More In Category


Standards

Design guide offers details on rain loads and ponding on roofs

The American Institute of Steel Construction and the Steel Joist Institute recently released a comprehensive roof design guide addressing rain loads and ponding. Design Guide 40, Rain Loads and Ponding provides guidance for designing roof systems to avoid or resist water accumulation and any resulting instability.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021