flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Codes and Standards

New, comprehensive insurance exhibit released in AIA 2017 contract document updates

Will allow AIA to make updates more frequently as insurance market changes.


By Peter Fabris, Contributing Editor | October 16, 2017
Documents
Documents

The updated AIA 2017 project contract documents include a new, comprehensive insurance exhibit that will allow for easier, more frequent updates as conditions in the insurance market change.

The insurance exhibit is intended to be used in conjunction with the A101–2017, A102–2017, and A103–2017 contract documents. One goal of the document’s drafters was to make it easier for users to transmit the insurance exhibit to the user’s insurance advisor or broker for evaluation and completion. AIA says the new insurance exhibit will allow changes to be made without having to revise the General Conditions document.

The insurance exhibit requires either the owner or the contractor to purchase property insurance written on a builder's risk “all-risks” completed value or equivalent policy form. It should be of an amount that can cover the total value of the entire project on a replacement cost basis. If the project is a remodeling of an existing structure or addition to one, the property insurance must also cover the existing structure against physical loss or damage on a replacement cost basis.

The insurance must be maintained through substantial completion and continued or replaced through the contractor’s one-year period for correction of the work. The insurance must include the interests of the owner, contractor, subcontractors, and sub-subcontractors, and the interests of mortgagees as loss payees.

In addition to the required property coverage, the agreement may include optional extended property insurances that the owner will purchase and maintain. This could include

Ordinance or Law Insurance; Expediting Cost Insurance; and Loss of Use, Business Interruption, and Delay in Completion Insurance.

For more information, visit: www.aiacontracts.org.

Related Stories

| Sep 15, 2011

New Label Established For Energy Efficient Doors in UK

The British Fenestration Ratings Council (BFRC) has established a labelling program for all types of domestic pedestrian doors. 

| Sep 15, 2011

EPA Releases New High-Rise Residential Energy Star Rating

The U.S. Environmental Protection Agency recently announced an Energy Star rating for multi-family high-rise buildings. 

| Sep 15, 2011

Bill Seeks To Spur Stronger Building Codes Nationwide

The Safe Building Code Incentive Act of 2011 would provide strong financial incentives for states to adopt and enforce strong building codes.  

| Sep 15, 2011

New Federal Law Limits Amount of Formaldehyde in Wood

President Obama signed into law legislation that limits the amount of formaldehyde in wood. The new measure will impact particle board and other composite wood products .

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 8, 2011

OSHA issues alert on incorrectly rebuilt circuit breakers

The Occupational Safety and Health Administration (OSHA) has issued a hazard alert, warning workers and employers of certain Eaton/Cutler-Hammer molded-case circuit breakers that were incorrectly rebuilt. 

| Sep 8, 2011

USGBC Streamlines LEED EB: O&M

The Council has reorganized the prerequisite and credit structure of LEED EB: O&M. 

| Sep 8, 2011

USGBC: 30 Legislative ‘Wins For Green Building’ So Far In 2011

A mid-year report by the U.S. Green Building Council says that there have been “30 legislative wins for green building” across 22 states in 2011. 

| Sep 8, 2011

Revised Building Codes Adopted After WTC Attacks Being Implemented

U.S. National Institute of Standards and Technology (NIST) code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction including One World Trade Center, the lead building of the new World Trade Center complex. 

| Sep 8, 2011

New Sustainability Standard Addresses Disaster Resistance

To aid local governments to adopt high-performance green building codes, the Portland Cement Association (PCA) and the Institute for Business and Home Safety (IBHS) have developed High Performance Building Requirements for Sustainability 2.0. 

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021