flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Metl-Span Stands Tall for Amazon Fulfillment Center

Sponsored Content

Metl-Span Stands Tall for Amazon Fulfillment Center

Insulated Metal Panels Deliver Perfect Configuration, Preferred Performance


By METL-SPAN | August 17, 2020

The Amazon fulfillment center near Spokane, Wash., is one of many centers across the country for the e-commerce giant where products are stored and then shipped to consumers who have made purchases through their online platform. As many as 1,500 employees work alongside robots to confirm orders, get them loaded onto trucks and then send them out the door to their final destination. 

The 750,000-square-foot facility has four floors.

During the planning phases for the massive structure, architects and designers realized they had a large area to cover when it came to the exterior walls. 

Metl-Span insulated metal panels became the preferred solution.

 

From Floor to Ceiling

 

At the outset, architects knew they needed to achieve uniformity in look for the building’s exterior, a request that came from the building owner.

“[Amazon] wanted a single product that went from the top of the concrete footing up to the roofline,” said Bill Thordarson, regional manager, Bain Associates, which served as the manufacturer’s representative on the project. “That’s about 50 feet.”

Contractors installed nearly 10,000 square feet of Metl-Span CF Mesa insulated metal panels. The lightly corrugated profile on both faces of the panel created symmetry on the outside of the building. The panels spanned between 42 and 49 feet in length. 

To create the right design aesthetic, architects chose four different colors for the panels – Polar White, Sandstone, Zinc Gray and Smoke Gray.

“With the ability to choose different colors, the building avoids a monochromatic look,” Thordarson added. “It has some texture and aesthetic quality to it.”

The CF Mesa panels are manufactured with an offset double tongue-and-groove system, allowing the panels to slide into each other for ease and efficiency in installation. 

In addition, the panels are only fastened on one side, which allows for a concealed system.  

This versatility added to the visual appeal of the building’s exterior wall, creating a seamless flow from panel to panel.

 

 

Running Hot and Cold

 

As an insulated metal panel, CF Mesa panels are manufactured with foamed-in-place insulation. The panels deliver optimal thermal performance, another mandate when constructing the Amazon fulfillment center in the kind of climate experienced by Spokane, Wash. 

“It gets superhot in the summer and supercold in the winter,” Thordarson remarked. “The beauty of the foam-insulated panels is that you’re also achieving a superhigh R value, so you don’t have to worry about insulating the inside of the building.”

CF Mesa panels are ideal in cold storage applications such ascooler buildings, freezers, food processing buildings, dry goods warehouses, and any structure where temperature control and insulation values are critical.


Economic Driver

 

Opened in June 2020, the Amazon fulfillment center outside Spokane has spurred additional development in the area.

During peak holiday periods, the facility employs as many as 3,000 people.

 

Metl-Span
1720 Lakepointe Drive Suite 101
Lewisville, Texas 75057 
877.585.9969 
www.metlspan.com
info@metlspan.com

 

Tags

Related Stories

Sponsored | | Oct 13, 2014

Think you can recognize a metal building from the outside?

It’s getting more and more difficult to spot a metal building these days. What looks like brick, stucco or wood on the outside could actually be a metal building in disguise. SPONSORED CONTENT

Sponsored | | Sep 30, 2014

How project managers can manage technology

Not long ago, the role of a construction project manager revolved around working with people: employees, vendors, consultants, designers, subcontractors and owners. Today, project managers primarily manage information. SPONSORED CONTENT

| Sep 24, 2014

5 business lessons from a 43-year Star veteran

Mary Ed Cain was supposed to be born a boy. That was the first time she surprised everyone. The second time came on a daily basis during her 43-year career at Star Building Systems. SPONSORED CONTENT

| Jul 21, 2014

16 utility questions to answer during your building project

We need electricity to power our building projects, along with water and gas and a faultless sanitation system. That’s what we think about when we think about utility requirements for our building project, but are we missing something? SPONSORED CONTENT

Sponsored | | Jul 17, 2014

A major hop forward

The construction of efficient metal buildings has helped Perrault Farms expand its hops-harvesting business.

| Jul 17, 2014

22 land questions to decide if your build site works

When you’re ready to build, land needs a serious amount of attention. Since it can singlehandedly shift your building plans, land must be investigated, questioned, and eyed from every angle. SPONSORED CONTENT

| Jul 9, 2014

The one misstep that could be slowing your company’s growth

Change. It’s inevitable. And success for any professional may very well depend on how well we adapt to it. SPONSORED CONTENT

| May 27, 2014

Contractors survey reveals improving construction market

The construction industry is on the road to recovery, according to a new survey by Metal Construction News. Most metrics improved from the previous year’s survey, including a 19.4% increase in the average annual gross contracting sales volume. SPONSORED CONTENT

| May 11, 2014

8 starter questions to answer when thinking about building

So, are you ready to start building? Completing these eight questions will help you answer that confidently. SPONSORED CONTENT

| Apr 25, 2014

A radiant barrier FAQ: Everything you wanted to know but were afraid to ask

There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021