Make It Right is adding six single-family home designs to complement the organization’s existing affordable housing and community complex in Kansas City, Mo., called Manheim Park.
According to ArchDaily, local architects designing the new homes are working to expand Make It Right’s efforts in Kansas City while also maintaining sustainability and following LEED Platinum standards.
In a press release, Make It Right stated:
In 2013, we opened an affordable housing and community complex for young people transitioning out of foster care, seniors, and families in need in Kansas City’s Manheim Park, an underserved urban neighborhood.
This year we are continuing our work in Manheim Park by building single-family homes on vacant lots directly across from the Bancroft Apartments.
Block by block, we believe that Manheim Park can become the most vibrant, desirable neighborhood in Kansas City, says Tim Duggan, Make It Right Innovations Director and Kansas City native.
There were six firms involved in designing the homes:
- El Dorado Inc.
- BNIM
- Hufft Projects
- DRAW
- KEM Studio
- Pendulum Studio
Here are their plans:
Design by Hufft Projects. Rendering courtesy of Make It Right.
Design by BNIM. Rendering courtesy of Make It Right.
Design by DRAW. Rendering courtesy of Make It Right.
Design by El Dorado Inc. Rendering Courtesy of Make It Right.
Design by KEM Studio. Rendering courtesy of Make It Right.
Design by Pendulum Studio. Rendering courtesy of Make It Right.
Related Stories
| Aug 11, 2010
Construction employment declined in 333 of 352 metro areas in June
Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America. The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.
| Aug 11, 2010
Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors
A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms
A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
10% of world's skyscraper construction on hold
Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.
| Aug 11, 2010
Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report
A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Skanska completes $74 million Harbor Towers project six months ahead of schedule
Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.
| Aug 11, 2010
Best AEC Firms of 2011/12
Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +