flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

KBE Building wins honor for Armed Forces Reserve Center

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.


By Posted by Tim Gregorski, Senior Editor | June 27, 2012
The $54 million, 203,000-sf AFRC facility in Middletown, Conn.
The $54 million, 203,000-sf AFRC facility in Middletown, Conn.

KBE Building Corporation (KBE) (www.kbebuilding.com) earned a First Place Award for the Armed Forces Reserve Center (AFRC) at the 2012 Connecticut Building Congress (CBC) 16th Annual Project Team Awards Banquet in the category of Best New Project over $10 million.

The $54 million, 203,000-sf AFRC facility in Middletown, Connecticut encompasses a state-of-the-art training center, a vehicle maintenance facility, and a field equipment storage facility for the Connecticut National Guard and Army Reserve. KBE Building Corporation was the Design-Builder for the project in a joint venture with DeRita Construction Company, with Kleinfelder as the Architect of Record. The construction phase was completed in just 16 months, a remarkable achievement given the scope of work, which included the removal of nearly 500,000 cubic yards of soil and rock from the site. The new Reserve Center features numerous “green” building measures, including a “green” roof, photovoltaic arrays, and high-efficiency heating and cooling systems.

Previously, the Armed Forces Reserve Center project won Best in Show from Connecticut’s Associated Builders and Contractors, Inc., as well as the 2012 Engineering Excellence Grand Award from the American Council of Engineering Companies. +

Related Stories

| Aug 11, 2010

'Flexible' building designed to physically respond to the environment

The ecoFLEX project, designed by a team from Shepley Bulfinch, has won a prestigious 2009 Unbuilt Architecture Design Award from the Boston Society of Architects. EcoFLEX features heat-sensitive assemblies composed of a series of bi-material strips. The assemblies’ form modulate with the temperature to create varying levels of shading and wind shielding, flexing when heated to block sunlight and contracting when cooled to allow breezes to pass through the screen.

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021