flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

The High Line’s co-designer wins contract for The Underline in Miami

Cultural Facilities

The High Line’s co-designer wins contract for The Underline in Miami

James Corner Field Operations will design the master plan for this 10-mile restoration project. 


By John Caulfield, Senior Editor | March 17, 2015
The High Line’s co-designer wins contract for The Underline in Miami

The proposed 10-mile Underline park. Courtesy Anna Baez/Underline

A local jury in Miami has selected New York-based architectural firm James Corner Field Operations to design the master plan for The Underline bike route and lineal park.

The vision for The Underline is a 10-mile urban trail and park that would replace the underutilized M-Path, a bike path under the Metrorail tracks, from the Dadeland South Station to Brickell Station, and extend to the Miami River. It would connect communities, improve pedestrian and bicyclist safety, create acres of new green space, and attract development along US 1.

The Miami Herald reports that Field Operations will design the overall plan under a $500,000 contract that is funded by the cities of Miami, South Miami, and the Gables, along with the Knight Foundation, the Miami Foundation, the Health Foundation of South Florida and the Mitchell Wolfson Foundation.

 

 

Field Operations’ submission was chosen among entries from 19 firms.

The architect was the co-designer of the 1.45-mile High Line park, which sits atop an abandoned elevated railway   on Manhattan’s West Side. Its master plan for The Underline is due in September. (A year ago, The University of Miami School of Architecture devoted a studio class of 10 students—under the direction of Professor Rocco Ceo and assisted by Arquitectonica’s Raymond Fort—and to create a preliminary concept plan for The Underline.)

The Herald reports that public and private financing sources for construction of this project have yet to be identified. The project is expected to take a decade to complete. 

Related Stories

| Oct 12, 2010

Richmond CenterStage, Richmond, Va.

27th Annual Reconstruction Awards—Bronze Award. The Richmond CenterStage opened in 1928 in the Virginia capital as a grand movie palace named Loew’s Theatre. It was reinvented in 1983 as a performing arts center known as Carpenter Theatre and hobbled along until 2004, when the crumbling venue was mercifully shuttered.

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Oct 12, 2010

The Watch Factory, Waltham, Mass.

27th Annual Reconstruction Awards — Gold Award. When the Boston Watch Company opened its factory in 1854 on the banks of the Charles River in Waltham, Mass., the area was far enough away from the dust, dirt, and grime of Boston to safely assemble delicate watch parts.

| Oct 12, 2010

Cuyahoga County Soldiers’ and Sailors’ Monument, Cleveland, Ohio

27th Annual Reconstruction Awards—Gold Award. The Cuyahoga County Soldiers’ and Sailors’ Monument was dedicated on the Fourth of July, 1894, to honor the memory of the more than 9,000 Cuyahoga County veterans of the Civil War.

| Oct 12, 2010

Building 13 Naval Station, Great Lakes, Ill.

27th Annual Reconstruction Awards—Gold Award. Designed by Chicago architect Jarvis Hunt and constructed in 1903, Building 13 is one of 39 structures within the Great Lakes Historic District at Naval Station Great Lakes, Ill.

| Oct 12, 2010

From ‘Plain Box’ to Community Asset

The Mid-Ohio Foodbank helps provide 55,000 meals a day to the hungry. Who would guess that it was once a nondescript mattress factory?

| Sep 22, 2010

Michael Van Valkenburg Assoc. wins St. Louis Gateway Arch design competition

Landscape architect Michael Van Valkenburgh and a multidisciplinary team of experts in “urban renewal, preservation, commemoration, social connections and ecological restoration” have been picked for the planning phase of The City+The Arch+The River 2015 International Design Competition.

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

boombox1 - default
boombox2 -
native1 -

More In Category

Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021