flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Giants 300 Science & Technology Report

Giants 300 Science & Technology Report

BD+C's Giants 300 Top 25 AEC Firms in the Science & Technology sector.


By Posted by Tim Gregorski, Senior Editor | August 8, 2012
Building Team: DGA Builders (CM), Bergmann Associates (EA), Kennedy Mechanical (
Building Team: DGA Builders (CM), Bergmann Associates (EA), Kennedy Mechanical (mechanical engineer), and Billitier Electric (el
This article first appeared in the August 2012 issue of BD+C.

Students work in the undergraduate chemistry classroom, in the University of Rochester’s Hutchison Hall, a structure originally built in the 1960s.

Constructed in three months at a cost of $1.5 million, the 2,265-sf laboratory is a prototype for future development at the university. According to Joseph Dinnocenzo, professor of chemistry at the University of Rochester, the lab was designed to bring together the three phases of experimental work: design, execution, and analysis.

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR ARCHITECTURE FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 HDR Architecture 60,900,000  
2 Perkins+Will 54,976,710  
3 HOK 39,049,209  
4 Flad Architects 35,280,000  
5 SmithGroupJJR 31,200,000  
6 Payette 17,207,046  
7 Ballinger 10,940,133  
8 EwingCole 10,000,000  
9 S/L/A/M Collaborative, The 7,895,193  
10 NBBJ 7,394,000  
11 PageSoutherlandPage 7,038,000  
12 BSA LifeStructures 6,339,395  
13 Ennead Architects 5,890,000  
14 Gensler 4,100,000  
15 Harley Ellis Devereaux 3,600,000  
16 OZ Architecture 3,006,974  
17 Wight & Company 2,959,100  
18 ZGF Architects 2,781,476  
19 Ware Malcomb 2,264,000  
20 Kirksey Architecture 2,108,182  
21 Reynolds, Smith and Hills 2,100,000  
22 Lord, Aeck & Sargent 1,445,819  
23 Perkins Eastman 1,300,000  
24 SMMA|Symmes Maini & McKee Associates 1,217,481  
25 IBI Group 1,206,499  

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR ENGINEERING FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 Jacobs 692,920,000
2 M+W U.S. 105,132,043
3 Stantec 42,300,000
4 Affiliated Engineers 14,482,000
5 Middough 12,500,000
6 URS Corp. 11,485,000
7 Bard, Rao + Athanas Consulting Engineers 10,000,000
8 R.G. Vanderweil Engineers 8,231,300
9 Merrick & Co. 6,150,000
10 Bergmann Associates 5,300,000
11 RMF Engineering 4,500,000
12 WSP USA 4,200,000
13 Smith Seckman Reid 4,070,000
14 Clark Nexsen 4,046,032
15 STV 3,082,000
16 SSOE Group 3,043,000
17 Thornton Tomasetti 1,792,193
18 ccrd partners 1,250,000
19 RMH Group, Inc., The 1,192,171
20 RDK Engineers 1,092,000
21 Wiss, Janney, Elstner Associates 1,037,000
22 KPFF Consulting Engineers 1,000,000
23 AKF Group 1,000,000
24 Paulus, Sokolowski and Sartor 1,000,000
25 Karpinski Engineering 868,947

 

TOP 25 SCIENCE & TECHNOLOGY SECTOR CONSTRUCTION FIRMS

Rank Company 2011 Science & Technology Revenue ($)
1 Whiting-Turner Contracting Company, The 704,586,928
2 Jacobs 692,920,000
3 Turner Corporation, The 270,000,000
4 DPR Construction 260,132,313
5 Manhattan Construction Group 203,632,000
6 JE Dunn Construction 147,553,307
7 Lend Lease 135,276,349
8 Structure Tone 105,970,000
9 Tutor Perini 68,084,000
10 Layton Construction 45,300,000
11 E.W. Howell Co. 43,137,000
12 McCarthy Holdings 41,000,000
13 Weitz Company, The 39,314,126
14 Messer Construction Co. 28,777,706
15 Coakley & Williams Construction 22,023,492
16 Flintco 20,800,000
17 Gilbane Building 17,822,000
18 Choate Construction 15,422,770
19 S. M. Wilson & Co. 12,268,944
20 Linbeck Group 12,000,000
21 URS Corp. 11,485,000
22 CORE Construction 8,242,587
23 McShane Companies, The 8,000,000
24 Yates Companies, Inc., The 4,000,000
25 Kraus-Anderson Construction 3,000,000

Related Stories

Healthcare Facilities | Mar 18, 2024

A modular construction solution to the mental healthcare crisis

Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.

Codes and Standards | Mar 18, 2024

New urban stormwater policies treat rainwater as a resource

U.S. cities are revamping how they handle stormwater to reduce flooding and capture rainfall and recharge aquifers. New policies reflect a change in mindset from treating stormwater as a nuisance to be quickly diverted away to capturing it as a resource.

Plumbing | Mar 18, 2024

EPA to revise criteria for WaterSense faucets and faucet accessories

The U.S. Environmental Protection Agency (EPA) plans to revise its criteria for faucets and faucet accessories to earn the WaterSense label. The specification launched in 2007; since then, most faucets now sold in the U.S. meet or exceed the current WaterSense maximum flow rate of 1.5 gallons per minute (gpm). 

MFPRO+ New Projects | Mar 18, 2024

Luxury apartments in New York restore and renovate a century-old residential building

COOKFOX Architects has completed a luxury apartment building at 378 West End Avenue in New York City. The project restored and renovated the original residence built in 1915, while extending a new structure east on West 78th Street. 

Multifamily Housing | Mar 18, 2024

YWCA building in Boston’s Back Bay converted into 210 affordable rental apartments

Renovation of YWCA at 140 Clarendon Street will serve 111 previously unhoused families and individuals.

Healthcare Facilities | Mar 17, 2024

5 criteria to optimize medical office design

Healthcare designers need to consider privacy, separate areas for practitioners, natural light, outdoor spaces, and thoughtful selection of materials for medical office buildings.

Construction Costs | Mar 15, 2024

Retail center construction costs for 2024

Data from Gordian shows the most recent costs per square foot for restaurants, social clubs, one-story department stores, retail stores and movie theaters in select cities.

Architects | Mar 15, 2024

4 ways to streamline your architectural practice

Vessel Architecture's Lindsay Straatmann highlights four habits that have helped her discover the key to mastering efficiency as an architect.

Healthcare Facilities | Mar 15, 2024

First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care

Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.

Codes and Standards | Mar 15, 2024

Technical brief addresses the impact of construction-generated moisture on commercial roofing systems

A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.

boombox1 - default
boombox2 -
native1 -

More In Category


AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


Codes and Standards

Updated document details methods of testing fenestration for exterior walls

The Fenestration and Glazing Industry Alliance (FGIA) updated a document serving a recommended practice for determining test methodology for laboratory and field testing of exterior wall systems. The document pertains to products covered by an AAMA standard such as curtain walls, storefronts, window walls, and sloped glazing. AAMA 501-24, Methods of Test for Exterior Walls was last updated in 2015. 


MFPRO+ News

World’s largest 3D printer could create entire neighborhoods

The University of Maine recently unveiled the world’s largest 3D printer said to be able to create entire neighborhoods. The machine is four times larger than a preceding model that was first tested in 2019. The older model was used to create a 600 sf single-family home made of recyclable wood fiber and bio-resin materials.

halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021