flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Enhancing university life: The smart shower bead

Sponsored Content University Buildings

Enhancing university life: The smart shower bead

Residential spaces that need to meet high traffic demands while accommodating an ever-changing populace creates a unique set of obstacles for any educational institution’s housing.


By Trim-Tex | October 3, 2016

Seven buildings are part of the University of Kentucky Residential Revival project, once complete they all are seeking LEED certification.

Living on campus during college becomes as much a part of any students’ academic growth as attending classes. In the race to attract the best and brightest minds, universities are focusing on creating spaces of comfort and productivity. Residential spaces that need to meet high traffic demands while accommodating an ever-changing populace creates a unique set of obstacles for any educational institution’s housing. Additionally, demonstrating leading environmental thoughts by constructing with green building initiatives top the priority list.

For the University of Kentucky Residential Revival project, expanding student living quarters to include seven buildings and 3000 additional beds tasked contractors Messer and Quality Interiors with maintaining a hypo-allergenic environment that withstands extensive use, while installing with ease. Upon completion of the five-year project, campus housing will seek LEED Silver certification, so Messer and Quality Interiors sought out environmentally conscious products.

Between the high volume construction, varied hypo-allergenic needs of the students, green initiatives, and the desire to create a lasting professional finish, Messer and Quality Interiors searched for durable products with environmentally-friendly manufacturing. Using shower bead constructed from vinyl rather than metal became an obvious choice. Vinyl bead prevents rust, kinks, dents, and maintains a professional look for longer due to its flexible and durable nature. For finishing shower surrounds, they chose Trim-Tex’s Shower Bead.

 

Step 1 Shower Bead is installed around the surround, Step 2 finish with mud compound, Step 3 remove the tear off strip and caulk the gap for a clean finish.

 

The unique vinyl construction of Trim-Tex Shower Bead replaces paper tape, thereby eliminating the food source for mold and maintaining a hypo-allergenic environment long-term. Shower Bead also features an extra-long 2¼" mud leg that requires less mud to span the gap between the drywall and flange. A tear away strip protects the shower enclosure from mud and leaves a crisp, finished edge with no mess. Using staples instead of screws, Trim-Tex Shower Beads save time on labor while guaranteeing a professional finish.

Trim-Tex manufactures all of its products in the USA using 70% recycled material. This helps keep millions of pounds of plastic out of landfills each year and contributes to an overall green construction initiative. By selecting Trim-Tex Shower Bead for the University of Kentucky Residential Revival project, Messer and Quality Interiors provided a long-lasting, hypo-allergenic, environmentally-conscious solution that will withstand the rigors of university residential life for decades to come.

For more information visit Trim-Tex.com.

Related Stories

| Nov 18, 2011

Centre for Interactive Research on Sustainability opens

Designed to exceed LEED Platinum, the Centre for Interactive Research on Sustainability (CIRS) is one of the most innovative and high performance buildings in North America today, demonstrating leading-edge green building design products, technologies, and systems.

| Nov 11, 2011

Streamline Design-build with BIM

How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.

| Nov 11, 2011

AIA: Engineered Brick + Masonry for Commercial Buildings

Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam. 

| Nov 4, 2011

Two Thornton Tomasetti projects win NCSEA’s 2011 Excellence in Structural Engineering Awards

Altra Sede Regione Lombardia and Bank of Oklahoma Center both recognized.

| Oct 17, 2011

Clery Act report reveals community colleges lacking integrated mass notification systems

  “Detailed Analysis of U.S. College and University Annual Clery Act Reports” study now available. 

| Oct 14, 2011

University of New Mexico Science & Math Learning Center attains LEED for Schools Gold

Van H. Gilbert architects enhances sustainability credentials.

| Oct 12, 2011

Bulley & Andrews celebrates 120 years of construction

The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction. 

| Sep 30, 2011

Design your own floor program

Program allows users to choose from a variety of flooring and line accent colors to create unique floor designs to complement any athletic facility. 

| Sep 23, 2011

Okanagan College sets sights on Living Buildings Challenge

The Living Building Challenge requires projects to meet a stringent list of qualifications, including net-zero energy and water consumption, and address critical environmental, social and economic factors. 

boombox1
boombox2
native1

More In Category


Mass Timber

Mass timber a big part of Western Washington University’s net-zero ambitions

Western Washington University, in Bellingham, Wash., 90 miles from Seattle, is in the process of expanding its ABET-accredited programs for electrical engineering, computer engineering and science, and energy science. As part of that process, the university is building Kaiser Borsari Hall, the 54,000-sf new home for those academic disciplines that will include teaching labs, research labs, classrooms, collaborative spaces, and administrative offices.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021