flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Elgin Tower: Elgin's heart beats again

Reconstruction Awards

Elgin Tower: Elgin's heart beats again

A project team brings this Chicago suburb’s landmark tower back to life.


By David Barista, Editorial Director | December 3, 2018
Elgin Tower

The Elgin Tower has been successsfully converted into a 44-unit rental property. Photo: Skender

Completed in May 1929 as the headquarters for Home National Bank and Home National Savings and Trust, the 15-story Elgin Tower has had a tumultuous history. The Crash of ’29 forced the savings institution to declare bankruptcy. From that point on, the Art Deco building housed a wide range of owners and tenants, from Walgreens to the Elgin National Watch Company. Other than a short stint of prosperity in the late 1940s, the tower never achieved its promise as the city’s landmark commercial building.

Until now.

Working with the current owner, Capstone Development Group, the city of Elgin in 2016 endeavored to rehabilitate the historic tower as the centerpiece of its 20-year, $50 million downtown redevelopment plan.

“When this building was built, it signified the transition of Elgin from a rural town to a city,” said Elgin’s mayor, Dave Kaptain, referring to this suburban city of 112,000 northwest of Chicago. “That’s why it was so important that we preserve this building. This is the capstone.”

Contractor Skender and architect Webster Design were determined to save the building, which was added to the National Register of Historic Places in 2002 but had been condemned and partially destroyed by arson.

Using city/state tax increment financing and federal historic tax credits, the project team completed a 60,000-sf, $12 million gut rehabilitation that converted the office/retail building into 44 market-rate apartment units.

They salvaged original terrazzo in the corridors, refinished or recreated wooden landmark unit entries (formerly storefronts), repainted and patched all the plaster, installed elevators that would operate within the existing shafts, replaced exterior windows, and conducted a host of exterior façade treatments—tuck pointing, stone replacement, and abatement.

It was a logistical quagmire. With no alley, street-facing operations, or loading dock, the team had to file for multiple street closures. A hoist was only possible on the outside of the building to floor 11; there was no elevator service or hoist access on floors 11 through 15, so materials and supplies had to be carried by hand. New stairwells were cut between floors 1-3 and 11-14. Window replacement work required a 45- to 60-day approval process from both state and federal landmark commissions.

All the hard work paid off. For the first time in its long history, the Elgin Tower is at near capacity (90% occupancy at press time).

Said Weber Design’s Damon Femmer, AIA, LEED AP, “The heart of the city is beating again.”

 

 

Bronze Award Winner

BUILDING TEAM Skender (submitting firm, GC) Capstone Development Group (developer) Webster Design (architect) The WT Group (SE, MEP) DETAILS 60,000 sf Total cost $12 million Construction time April 2016 to December 2017 Delivery method Guaranteed maximum price

 

CLICK HERE TO GO TO THE 2018 RECONSTRUCTION AWARDS LANDING PAGE

Related Stories

Reconstruction Awards | Dec 19, 2019

BD+C's 2019 Reconstruction Award Winners

The Museum at the Gateway Arch, the Senate of Canada building, and Google, Spruce Goose are just a few of the projects recognized with 2019 Reconstruction Awards.

Reconstruction Awards | Dec 13, 2019

A manse makeover: The Dahod Family Alumni Center at the Castle

A 1915 castle on BU’s campus is carefully restored for alumni events.

Reconstruction Awards | Dec 13, 2019

Community effort: Rose Collaborative

This post-Katrina project has become a citadel of the arts and education in the Crescent City.

Reconstruction Awards | Dec 12, 2019

New flight pattern: Google, Spruce Goose

The hangar that once housed the Spruce Goose is adapted to meet a tech giant’s workplace needs.

Reconstruction Awards | Dec 10, 2019

Enter the world of deep time: David H. Koch Hall of Fossils

The new enclosed FossiLab gives visitors a glimpse into the exacting work of Smithsonian scientists and preservationists.

Reconstruction Awards | Dec 6, 2019

TWA Hotel at JFK International Airport: Home away from home

A dormant, 1960s-era flight center is converted into a snazzy hotel and conference facility.

Reconstruction Awards | Dec 6, 2019

Columbus Metro Library Hilliard Branch

Senior living clubhouse becomes a modern library in central Ohio.

Reconstruction Awards | Dec 5, 2019

The 428: St. Paul's office corner

A long-forgotten five-and-dime store becomes a  speculative office property in Minnesota’s capital.

Reconstruction Awards | Dec 4, 2019

The squeeze is on: The Revolution Hotel

Once a 1950s-era YWCA, The Revolution is now a hip new hotel in The Hub.

Reconstruction Awards | Dec 2, 2019

Hudson Commons: Over the top

A project team converts a 1960s industrial structure into a Class A office gem.

boombox1 - default
boombox2 -
native1 -

More In Category


Giants 400

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021