CannonDesign manages a $2 billion hospital design review with digital processes

Sponsored Content AEC Tech

CannonDesign manages a $2 billion hospital design review with digital processes

Collectif Santé Montreal turns to Bluebeam Revu for project efficiency in establishing the largest hospital in Montreal.


By Bluebeam | May 31, 2016
CannonDesign manages a $2 billion hospital design review with digital processes

The Centre Hospitalier de l’Université de Montréal (CHUM) hospital project in Montreal, Canada. Image courtesy CannonDesign.

As the Architectural Project Delivery Leader for the new $2 billion (Canadian), 3.5 million square foot Centre Hospitalier de l’Université de Montréal (CHUM) hospital project in Montreal, Canada, Matt Forman, CannonDesign + NEUF architect(e)s knows how crucial project efficiency is to project delivery. CannonDesign and NEUF architect(e)s are the architects for Collectif Santé Montreal, the consortium which was awarded this sizeable P3 (or Public Private Partnership) project. A key objective of the consortium’s proposal was the delivery of almost 85% of the hospital functional program in the first phase—no small feat, literally, as the hospital is set to occupy two full city blocks as the largest hospital in Montreal, as well as one of the largest academic medical centers in North America. 

With more than 5,900 pages of architectural drawings to manage and deadlines looming, CannonDesign and NEUF architect(e)s turned to the use of room templates as a way of mitigating the number of floorplans required for this 14,000-room hospital. Even with the extensive use of templates, however, thousands of documents would still need to be managed. Enter PDF creation and editing solution Bluebeam Revu, which allows teams to easily markup and comment on project documents, as well as store documents as a single source of truth and track all editing activity with Revu’s integrated cloud collaboration solution, Bluebeam Studio.

Taking Design Reviews Digital

The design review process for CHUM includes three or more sets of meetings with users from each department—something which may sound reasonable at first, until one realizes there are more than 140 departments in the hospital! And with each meeting taking approximately three to four hours, this adds up to more than 1,200 hours of meetings for design review of the rooms alone. And that doesn’t even include the reviews with the rest of the consultant team. 

“Design review could have been an absolute nightmare,” shares Forman. “We decided to take this process digital by reviewing drawings with the users in Revu, saving us the time and hassle of marking them up by hand on tracing paper, then translating and typing up our notes before sending them to the rest of the architectural team.” Another motivation for going digital was the use of Revu’s Calibrate tool to confirm measurements, ensuring that the necessary medical equipment would actually fit, eliminating the back and forth communication that usually occurs. 

“We’ve estimated that it’s saved us about 2-3 weeks per review.” – Matt Forman at CannonDesign + NEUF architect(e)s.

During the design review phase with the MEP and other members of the consultant team, the architects would post all of the packages into a Studio Session, which enables real-time, document-based collaboration, and then invite the other consultants to join. Taking full advantage of this, Forman created a custom tool set—a collection of drag-and-drop icons used to markup documents—to share with the reviewers, assigning each firm a color. When team members would add markups or comments to a document in Studio, Forman could immediately see who made the changes, when they made them and who responded. 

Coordinating Complex Spaces with 3D PDFs

CannonDesign used 3D interior elevations to coordinate the project’s complex laboratory equipment layouts. Working in Revit, they used Codebook, an equipment data management tool, to add and track all of the equipment data. They would then save the file as a 3D PDF in Revu and share it with the hospital’s clinicians for review and approval of layouts. Leveraging 3D PDFs not only makes it easier to share robust BIM data in a lightweight format with partners downstream, but also enabled the clinicians to understand the layouts more easily than with a typical 2D floor plan. And because the team took the time to set up their Revit families correctly in the original drawing, all of the equipment data was carried into that 3D PDF.

Cutting Down QA/QC Timeline

CannonDesign’s previous QA/QC process used to consist of marking up paper drawings with a red pen. At this scale, that process was challenging due to the number of reviewers involved in any given set of drawings. The old method took more time, with comments trickling in over a period of several weeks. By streamlining them into a single set of markups in Revu and saving them into a Studio Session, they now have everything in one place. Additionally, comments can be easily assigned and tracked in Revu’s Markups list, a running spreadsheet-like record of document edits. Studio also proved to be especially valuable when Forman had to travel offsite. Using his iPad, Forman was able to log in to Studio Sessions through the Revu iPad app, review drawings, add his comments and keep the project on track in real time.  

“It’s taken a stunning amount of time out of our QA/QC process.” – Matt Forman at CannonDesign + NEUF architect(e)s.

No More Late Nights

After the QA/QC reviews were complete and the drawings approved by the registered architects, a secure seal and signature needed to be applied to each sheet. Instead of pulling an all-nighter to apply the seals to the sheets, the team used Revu’s Batch Apply Stamp tool, which applies a selected stamp in the same position to multiple PDFs or multiple pages of a PDF at the same time. “After spending about 30 minutes setting up the stamp alignment, it took us less than an hour to run the batch process,” explains Forman. “And now the process is repeatable. Between Revu’s nimble markup tools and having Studio as a common platform for multiple consultants to collaborate, the software really enabled and streamlined our large team workflow on this project.”

To learn more about Revu or download a free 30-day trial, please visit us here.

Tags

Related Stories

AEC Tech | Mar 14, 2023

Skanska tests robots to keep construction sites clean

What if we could increase consistency and efficiency with housekeeping by automating this process with a robot? Introducing: Spot.

Modular Building | Mar 3, 2023

Pallet Shelter is fighting homelessness, one person and modular pod at a time

Everett, Wash.-based Pallet Inc. helped the City of Burlington, Vt., turn a municipal parking lot into an emergency shelter community, complete with 30 modular “sleeping cabins” for the homeless.

AEC Tech | Jan 27, 2023

Epic Games' latest foray into the AEC market and real estate industry

From architecture to real estate, the realm of computer-aided design hits new heights as more and more firms utilize the power of Epic Games’ Twinmotion and Unreal Engine.

AEC Tech | Jan 27, 2023

Key takeaways from Autodesk University 2022

Autodesk laid out its long-term vision to drive digital collaboration through cloud-based solutions and emphasized the importance of connecting people, processes and data.

AEC Tech Innovation | Jan 24, 2023

ConTech investment weathered last year’s shaky economy

Investment in construction technology (ConTech) hit $5.38 billion last year (less than a 1% falloff compared to 2021) from 228 deals, according to CEMEX Ventures’ estimates. The firm announced its top 50 construction technology startups of 2023.

AEC Tech | Jan 19, 2023

Data-informed design, with Josh Fritz of LEO A DALY

Joshua Fritz, Leo A Daly's first Data Scientist, discusses how information analysis can improve building project outcomes. 

AEC Tech Innovation | Jan 14, 2023

CES recognizes a Dutch firm’s wearable technology for construction management

The firm’s TokenMe product offers construction managers a real-time crowd- and asset-tracking solution via low-power, location-aware radio and RFID tags and multiple sensors through which data are processed with cloud-based artificial intelligence.

Digital Twin | Nov 21, 2022

An inside look at the airport industry's plan to develop a digital twin guidebook

Zoë Fisher, AIA explores how design strategies are changing the way we deliver and design projects in the post-pandemic world.

Giants 400 | Nov 14, 2022

4 emerging trends from BD+C's 2022 Giants 400 Report

Regenerative design, cognitive health, and jobsite robotics highlight the top trends from the 519 design and construction firms that participated in BD+C's 2022 Giants 400 Report.

Contractors | Nov 14, 2022

U.S. construction firms lean on technology to manage growth and weather the pandemic

In 2021, Gilbane Building Company and Nextera Robotics partnered in a joint venture to develop an artificial intelligence platform utilizing a fleet of autonomous mobile robots. The platform, dubbed Didge, is designed to automate construction management, maximize reliability and safety, and minimize operational costs. This was just one of myriad examples over the past 18 months of contractor giants turning to construction technology (ConTech) to gather jobsite data, manage workers and equipment, and smooth the construction process.

boombox1 - default
boombox2 -
native1 -

More In Category

AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021