flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

A biopharma fitout in Colorado showcases one AEC firm’s Integrated Project Delivery approach

Building Team

A biopharma fitout in Colorado showcases one AEC firm’s Integrated Project Delivery approach

CRB Group supplements its own services with as-needed outside expertise.


By John Caulfield, Senior Editor | September 6, 2021
Members of Umoja Biopharma and CRB Group at the groundbreaking of a building fitout in Colorado

Representatives from Umoja Biopharma, CRB Group, and local government at the groundbreaking of a fitout that is being executed under CRB's ONEsolution delivery approach. Image: CRB Group

Late last month, the startup oncology company Umoja Biopharma and CRB Group, a sustainable AEC and consulting firm, started construction on the fitout of a 146,000-sf building in Louisville, Colo.

CRB, whose practices include Biotech, food and beverage, pharma, and Science + Technology, is transforming the existing building into highly flexible and scalable manufacturing, lab, office, and warehouse space. The design focuses on integrating LEED criteria and zero-carbon emissions to meet Umoja’s sustainability goals. The project is in two phases, and should be completed by October.

What makes this project different is the application of CRB’s ONEsolution delivery approach, where the firm—whose services include architecture, engineering, construction, and consultation—will take the fitout from its initial planning to operational readiness. CRB, with 18 offices in North America and two in Europe, espouses the principles of Integrated Project Delivery, and uses lean construction tools to align stakeholders on all aspects of the project.

ONEsolution is “key” to “creating a collaborative environment” with clients like Umoja, says Colton Konkak, CRB Group’s Colorado Market Team Leader, who spoke with BD+C last week about this project. He explains that the advantages of ONEsolution include early cost and scheduling certainty without any loss of design or construction integrity, “which is important for a startup.”

“Working closely with Umoja demonstrates their commitment to sustainability, diversity, equity, inclusion, creativity, and fast project delivery,” says Konkak. “These commitments and goals unified our team members and allowed us to support rapidly changing technology.”

 

ITS CAST INCLUDES EXPERT EXTRAS

CRB’s M.O. is to hire industy experts as needed on projects. For example, on the Umoja fitout it brought in three local subs: Impact Mechanical for MEP engineering, Kenny Electric for electrical installation, and HTI Labs for laboratory case workstations. “We aren’t bashful, either, about handing over our documents to other AEC firms, to get a second opinion,” says Konkak.

On certain other projects, CRB is dipping its toe into modularization through its SlateXpace multimodal manufacturing system that provides even greater opportunities for speed to market, cost control, and adaptability. Currently it is working with Germfree, which specializes in providing modular biopharma cleanrooms.

Related Stories

| Aug 11, 2010

CityCenter projects get LEED Gold

MGM Mirage and Infinity World Development have received LEED Gold certification for the first three CityCenter projects: the ARIA Resort hotel tower, ARIA Resort convention center and theater, and the Vdara Hotel (above). The CityCenter developers anticipate Gold or Silver LEED certification for the project's remaining developments, which include a Mandarin Oriental hotel, a 500,000-sf retail a...

| Aug 11, 2010

BIG beats out Foster and Hadid in design competition for Kazakhstan's National Library

Invited as one of five pre-selected architect-led teams that included Lord Norman Foster and Zaha Hadid, Copenhagen-based BIG was awarded first prize in an international design competition for the new National Library in Astana, Kazakhstan. The 33,000-square-meter facility will be organized as a “circular loop of knowledge” that allows for clear, intuitive orientation of the vast co...

| Aug 11, 2010

Connecticut high school gets a expansion and renovation

The Morganti Group, Danbury, Conn., is managing the construction of a $41 million addition and renovation project at Newtown (Conn.) High School. Designed by Fletcher Thompson, Shelton, Conn., the project consists of a 70,000-sf addition and 30,000 sf of renovations to the gymnasium and interior spaces.

| Aug 11, 2010

Philadelphia cancer center seeks LEED certification

The New York office of Thornton Tomasetti provided structural engineering services for the Ruth and Raymond Perelman Center for Advanced Medicine in Philadelphia, a $232 million medical research center and advanced treatment center for cancer and cardiovascular disease. Designed by a joint venture of Perkins Eastman Architects and Rafael Vinõly Architects, the 340,000-sf facility will hous...

| Aug 11, 2010

Broadway-style theater headed to Kentucky

One of Kentucky's largest performing arts venues should open in 2011—that's when construction is expected to wrap up on Eastern Kentucky University's Business & Technology Center for Performing Arts. The 93,000-sf Broadway-caliber theater will seat 2,000 audience members and have a 60×24-foot stage proscenium and a fly loft.

| Aug 11, 2010

Office developer offers prebuilt units

Metropole Realty Advisors, owner and developer of the newly renovated 681 Fifth Avenue office building in Manhattan's Plaza District, has created a 6,000-sf, full-floor prebuilt unit that functions as both a model unit and built space for tenants unwilling to incur the cost of a build out. Designed by MKDA Designs, the space features contemporary finishes, 14-foot ceilings, and warm, neutral to...

| Aug 11, 2010

People+Firms

| Aug 11, 2010

Citizenship building in Texas targets LEED Silver

The Department of Homeland Security's new U.S. Citizenship and Immigration Services facility in Irving, Texas, was designed by 4240 Architecture and developed by JDL Castle Corporation. The focal point of the two-story, 56,000-sf building is the double-height, glass-walled Ceremony Room where new citizens take the oath.

| Aug 11, 2010

Brooklyn's tallest building reaches 514 feet

With the Brooklyner now topped off, the 514-foot-high apartment tower is Brooklyn's tallest building. Designed by New York-based Gerner Kronick + Valcarcel Architects and developed by The Clarett Group, the soaring 51-story tower is constructed of cast-in-place concrete and clad with window walls and decorative metal panels.

| Aug 11, 2010

Dallas Center for the Performing Arts opens

The Dallas Center for the Performing Arts, a new multi-venue center for music, opera, theater, and dance, will open this month, completing the 25-year vision of the Dallas Arts District. Foster + Partners, Rem Koolhaas, Joshua Prince-Ramus, and Skidmore Owings & Merrill are among the architecture firms involved in the development, which includes four venues unified by a 10-acre park.

boombox1 - default
boombox2 -
native1 -

More In Category



Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.


halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021