The Modular Building Institute’s Awards of Distinction Contest recognizes the best in commercial modular building design and construction.
This year’s contest garnered 147 entries, a 40% increase in nominees over last year, with modular buildings as diverse as a refurbished three-story supportive housing facility from a 2010 Winter Olympics Athletes Village, to a 35,620 sq. ft., green relocatable school complex installed in just 60 days.
For this year's contest, MBI member companies competed in the following categories: Permanent Modular, Temporary Modular, Renovated Reuse, Marketing Pieces, and Green Building Design.
The volunteer judging pool was comprised of Robert Cassidy, Editor-in-Chief, Building Design + Construction Magazine; Mohamed Al-Hussein, PhD, PE, Industrial Research Chair, University of Alberta; Dru Meadows, AIA, Principal, theGreenTeam, Inc.; Lorenz Schoff, PE, President, Energy Efficient Solutions; Robert Kobet, AIA, LEED, Faculty, President, Sustainaissance International; David Corson, Publisher, Commercial Construction Magazine; Kelsey Mullen, LEED AP, Director of Residential Business Development, U.S. Green Building Council; and Ryan E. Smith, AIA, Director of the Integrated Technology in Architecture Center, University of Utah College of Architecture + Planning.
The judges scored building entries on a number of criteria including architectural excellence, technical innovation, cost effectiveness, energy efficiency, and calendar days to complete, while marketing pieces were judged on strategy, implementation, and quantifiable results.
To view the extensive list of Awards of Distinction winners, please click here.
Related Stories
| Nov 11, 2012
Greenbuild 2012 Report: Higher Education
More and more colleges and universities see sustainainably designed buildings as a given
| Oct 4, 2012
2012 Reconstruction Awards Gold Winner: Wake Forest Biotech Place, Winston-Salem, N.C.
Reconstruction centered on Building 91.1, a historic (1937) five-story former machine shop, with its distinctive façade of glass blocks, many of which were damaged. The Building Team repointed, relocated, or replaced 65,869 glass blocks.
| Sep 7, 2012
Net-zero energy pioneers on the el-hi frontier
Getting to net-zero is not easy, but the promise of eliminating energy bills and using state-of-the-art technology as a learning lab can make a compelling case to reach for net-zero.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 15, 2012
Skanska to build the Beacon High School in New York City
The Beacon High School will be located in the Hell’s Kitchen neighborhood of Manhattan.
| Aug 7, 2012
Shedding light on the arts
Renovating Pietro Belluschi’s Juilliard School opens the once-cloistered institution to its Upper West Side community.
| Jul 25, 2012
KBE Building renovates UConn dining hall
Construction for McMahon Dining Hall will be completed in September 2012.
| Jul 20, 2012
2012 Giants 300 Special Report
Ranking the leading firms in Architecture, Engineering, and Construction.
| Jul 16, 2012
Business school goes for maximum vision, transparency, and safety with fire rated glass
Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.