flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Codes and Standards

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.


By Peter Fabris, Contributing Editor | February 23, 2021

Courtesy Pixabay

The ASHRAE Epidemic Task Force has updated its reopening guidance for HVAC systems to help mitigate the transmission of the COVID-19 virus.

“The Building Readiness Guide includes additional information and clarifications to assist designers and commissioning providers in performing pre- or post-occupancy flush calculations to reduce the time and energy to clear spaces of contaminants between occupancy periods,” said Wade Conlan, ASHRAE Epidemic Task Force Building Readiness team lead, in a news release. “New information includes the theory behind the use of equivalent outdoor air supply, method for calculating the performance of filters and air cleaners in series, and filter droplet nuclei efficiency that help evaluate the systems’ ability to flush the building.”

There is now a link to a view-only Google Sheet that can be downloaded for use. This will help determine the available equivalent outdoor air changes and time to perform the flush. 

The guide now also includes data to consider for heating of outdoor air and the potential impact on pre-heat coils in systems.

Related Stories

| Dec 1, 2011

Safety tracking tool helping prevent injuries at World Trade Center site

Since putting in place their Safety Management Systems Tracking Tool three years ago, risk managers for the World Trade Center project in New York say they've seen workplace injuries, reported hazards, and workers compensation claims decline.

| Dec 1, 2011

OSHA releases new construction safety videos

OSHA released new safety videos to offer both employers and workers brief, easy-to-understand education about construction safety.

| Dec 1, 2011

GSA Region 5 BIM standards could set national agenda in government contracting

Learning how the GSA wants to work with contractors using Building Information Models (BIM) will dramatically improve your odds of winning federal work.

| Nov 23, 2011

Fenestration council seeks committee members

The National Fenestration Rating Council (NFRC) is seeking members for a committee to pursue recognition of its ratings procedures from the American National Standard Institute (ANSI).

| Nov 23, 2011

Obama signs repeal of 3% withholding on government contracts

President Obama signed a bill that repeals a law requiring governments to withhold 3% of payments over $10,000 to contractors.

| Nov 23, 2011

USGBC launches app lab for LEED certification process

The U.S. Green Building Council has released the App Lab, a searchable catalog of third-party apps that are integrated with LEED data.

| Nov 23, 2011

Document gives advice on stormwater runoff management

The report, “Rooftops to Rivers II,” provides tips on how cities can use smart infrastructure and green building design to minimize pollution from stormwater runoff and other wastewaters.

| Nov 23, 2011

Zoning changes proposed to make New York City buildings greener

New York City will introduce new zoning proposals next month that would make it easier for building owners to add features that will make their properties more sustainable.

| Nov 18, 2011

AGC offers webinar on Davis-Bacon compliance

Webinar to be held in two sessions, Dec. 7 and 8 from 2:00-3:30 p.m. EST.

| Nov 18, 2011

New green construction code may help push LEED standards higher

The International Green Construction Code (IgCC) is expected to set a floor for building standards and may create the opportunity for LEED certifications to push toward higher ceilings.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021