flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

AEMSEN develops concept for sustainable urban living

Multifamily Housing

AEMSEN develops concept for sustainable urban living

The concept has been created for the redevelopment of the lots on the Barbizonlaan in Capelle aan den IJssel.


By David Malone, Associate Editor | July 7, 2020
Barbizon East Facade

All renderings courtesy AEMSEN

AEMSEN, a Rotterdam based architecture firm, has developed a sustainable, modular concept for urban living. 

Dubbed Barbizon and developed for the redevelopment of the lots on the Barbizonlaan in Capelle can den IJssel, the 129,000-sf project is a green residential complex built with prefabricated CLT modules. The 112 apartments in 16 different housing types vary in size from approximately 485 sf to approximately 1,300 sf. The factory-built CLT modules are stackable and switchable without additional auxiliary construction.

 

 

The facade and roof will include architectural facilities for trees and plants while separate facilities for insects and birds will provide biodiversity. A greenhouse will also be included for residents to grow their own fruit and vegetables. The greenhouses will also act as a space for social interaction between residents. 

 

Barbizon southeast facade

 

This social interaction plays a central role in the concept. The shared green spaces form a “green valley” that is accessible to all residents of the complex via the corridors.

The concept also features solar energy, water storage, and is CO2 neutral. While designed for Capelle aan den IJssel in The Netherlands, the concept is versatile enough for many locations around the world.

 

Barbizon Green Valley

 

Barbizon Green valley and greenhouses

 

Related Stories

| Aug 11, 2010

Architecture Billings Index flat in May, according to AIA

After a slight decline in April, the Architecture Billings Index was up a tenth of a point to 42.9 in May. As a leading economic indicator of construction activity, the ABI reflects the approximate nine to twelve month lag time between architecture billings and construction spending. Any score above 50 indicates an increase in billings.

| Aug 11, 2010

Construction employment declined in 333 of 352 metro areas in June

Construction employment declined in all but 19 communities nationwide this June as compared to June-2008, according to a new analysis of metropolitan-area employment data released today by the Associated General Contractors of America.  The analysis shows that few places in America have been spared the widespread downturn in construction employment over the past year.

| Aug 11, 2010

Jacobs, Hensel Phelps among the nation's 50 largest design-build contractors

A ranking of the Top 50 Design-Build Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Skanska completes $74 million Harbor Towers project six months ahead of schedule

Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021