flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

AECOM design and engineering team realizes NASA vision for Sustainability Base

AECOM design and engineering team realizes NASA vision for Sustainability Base

LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.


By By BD+C Staff | April 24, 2012
Sustainability Base will save more than 60% of the energy and more than 80% of t
Sustainability Base will save more than 60% of the energy and more than 80% of the water typically used by a facility of its typ

An integrated design and engineering effort led by AECOM, with a team including William McDonough + Partners, has guided NASA to the USGBC’s Platinum LEED rating for the new N232 office building at the NASA Ames Research Center in California.

The facility, known as Sustainability Base, officially opened April 20.

When NASA planned to add the first new building in 20 years to the Ames Research Center, home to much of the agency’s most innovative technology, the goal was that the facility be an exemplar in sustainability. The result is a working environment that prioritizes user health and comfort with natural daylight, fresh air and temperature control while making minimal environmental impacts. Sustainability Base will save more than 60% of the energy and more than 80% of the water typically used by a facility of its type.

An onsite fuel cell, roof-mounted photovoltaic solar panels, a geothermal heat pump, passive and low-energy HVAC systems, and intelligent building controls that interact with users are among the building’s advanced engineering features.

AECOM served as architect, engineer and landscape architect of record for the project, bringing on William McDonough + Partners for development of the design vision and sustainability goals for the project.

The Building Team also included Loisos + Ubbelohde (lighting consultant), Siteworks Studio (landscape design), MBDC (materials assessment) and Todd Ecological (wastewater treatment). BD+C

Related Stories

| Oct 12, 2010

Gartner Auditorium, Cleveland Museum of Art

27th Annual Reconstruction Awards—Silver Award. Gartner Auditorium was originally designed by Marcel Breuer and completed, in 1971, as part of his Education Wing at the Cleveland Museum of Art. Despite that lofty provenance, the Gartner was never a perfect music venue.

| Aug 11, 2010

test

boombox1 - default
boombox2 -
native1 -

More In Category


Mass Timber

5 solutions to acoustic issues in mass timber buildings

For all its advantages, mass timber also has a less-heralded quality: its acoustic challenges. Exposed wood ceilings and floors have led to issues with excessive noise. Mass timber experts offer practical solutions to the top five acoustic issues in mass timber buildings.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021